JOURNAL ARTICLES
Title Author Grade Year / Part
       
Wear of fishbolts of rail joints of permanent way Meredith W L P 1884
Methods of relaying permanent way Meredith W L P 1884
The Channel Tunnel  Watkin E  -  1885
Superelevation on the outer rail of permanent way curves Bee J N M 1885
Notes on Mr Bee's paper Jones W T  - 1885
Notes on methods of relaying permanent way Pugh A G M 1885
Widening of the gauge on curves Jones T W M 1886
Ballast for permanent way Jones T W M 1886
Metal sleepering (cast iron) Jones T W M 1886
Wear of wheels and rails Meredith W L PP 1886
The distribution of length gangs for repairs of permanent way Pinder J H M 1887
Comparative efficiency of steel fishbolts and lock nuts Meredith W L PP 1887
The theory of railway signalling O'Donnell J P  VP 1887
Permanent way and its maintenance Pugh A G M 1887
Comparative advantages of the use of double headed and bull headed rails Powell D B W VP 1887
Outside and inside keyed chairs Sargeant G M 1887
Permanent way   Murgatroyd S L  VP 1887
Properties of curved lines in laying permanent way, its switches and crossings Meredith W L PP 1887
Lifting and packing road Jones T W VP 1887
Maintenance of permanent way Howell J M 1887
Knowledge Hutchings J H M 1888
Knowledge or want of knowledge Pinder J H M 1888
A day with the unrecognised (summer meeting of permanent way inspectors) Hutchings J H M 1888
Opening of a new section at Bishopstoke (Eastleigh) anon  - 1888
Notes on railway slopes Meredith W L PP 1888
The breaking of rails under varying degrees of temperature Meredith W L PP 1888
Points and crossings Boothby R M 1888
Crossings, their sizes and distances according to radius of curves Stewart D AM 1888
Discussion on points and crossings Curtis J W M 1888
Remodelling of railway stations Meredith W L PP 1888
Power of determination Jones M M 1888
Ballasting and packing the permanent way Baker E E M 1888
The theory of railway signalling (continued) O'Donnell J P  VP 1889
The Forth Bridge Murgatroyd S L  VP 1889
Notes on French points and crossings, their calculation and construction Timmis I A PP 1889
The rationale of superelevation on railway curves Rattray D C  - 1890
Asphalt, its origin and its use Hirst W VP 1890
Repair materials, outside/inside keying of chairs, suspended/supported rail joints Crutch C M 1890
Superannuation Pugh A G M 1890
Progress of a platelayer Jones N M 1890
Point connections and their compensation Pilkington W AM 1891
Severe weather Tazewell B M 1891
The Permanent Way Institution Tazewell B M 1891
Formation of a Death and Benevolent Fund Pearce J VP 1891
Proposed Death Fund of the Permanent Way Institution Lomax J J AM 1891
On the Afghan Frontier Railway Woods J   - 1892
Service on an Indian railway Woods J   - 1892
Passing notes on recent works anon  - 1892
Lock and block signalling in connection with treadles and slots anon  - 1892
Superelevation on curves Pinder J H M 1893
Plymouth, past and present Hutchings J H M 1894
Light railways Hardy G H /Tyler J P Ed / M 1895-1
Guide bearings for rod connections Hardy G H   P Ed 1895-1
Pensions and the permanent way staff anon  - 1895-1
Planing of railway switches Hardy G H P Ed 1895-1
Rail creeping Hardy G H P Ed 1895-1
Southampton and its docks Warwick W HM 1895-2
Chart forming handy ready-reckoner for permanent way workers Butland W E M 1896-1
Strengthening of permanent way for speed increase Hunt W  - 1896-1
Rail creeping Hardy G H P Ed 1896-2
Experience with transverse steel sleepers in India Edge W L M 1896-2
Sleepers in British India anon  - 1896-2
Rules of the Permanent Way Institution anon  - 1897-1
Convention's visit to Dublin and Killarney Hirst W VP 1897-2
Useful hints to permanent way inspectors Evens A C  - 1897-2
Drainage Isherwood TA  - 1897-2
Creosoting timber Pugh A G M 1898-1
Rise and progress of railway signalling Elliott M F  - 1898-2
Experience in India (GIP) of a permanent way inspector anon  - 1898-2
Ambulance work among the Midland Railway men at Nottingham Fazackerley G  - 1899-1
The strengthening of permanent way anon  - 1899-1
Designation of railway curves anon  - 1899-2
Angles of crossings, practice and theory of measurement anon  - 1899-2
Signal cabin construction Healey G M 1900-1
The West Highland extension to Mallaig Hardy G H LM PP 1900-2
Maintenance of the permanent way, notes from 6th session, points and crossings Hardy G H LM PP 1900-2
Permanent way problems Lee T M 1901-1
Indian railway work Allen J M 1901-1
Ignorance etc. Hirst W LM PP 1901-1
Angle crossings Taylor B T M 1901-1
Visit to Barrow Haematite Steel Works Davies T J AM 1901-2
Reminiscences of 1901 summer meeting Healey G M 1901-2
Board of Trade Regulations for the prevention of accidents to railway servants Roberts J W M 1901-2
Railway curves Howe T VP M 1901-2
Notes on permanent way Couradi J F HM 1901-2
Measuring and laying crossings Scott H M 1901-2
Permanent way stock, maintaining and recording it Jelley S E AM 1902-1
Memorandum re future problems Cudworth W J Pat 1902-1
Light railways in Ireland Barrington W Pat 1902-2
Permanent Way summer convention 1902 Ridley T M 1902-2
Cork and Muskerry Railway Hill W H Jnr HM 1902-2
Notes on president's memorandum Meredith W L LM PP 1902-2
Our Institution Genders S M 1902-2
Permanent Way Institution versus technical and practical training Evens A C M 1902-2
Decimal fractions Cleaver W HM 1902-2
Problems connected with laying in of scissors crossings, three-throws, etc Scott H M 1902-2
Description of Hosgood and Dipper's patent apparatus anon  - 1902-2
Patent serrated rail for prevention of rail creeping anon   -  1902-2
Positions of crossings in ordinary and scissors crossovers Poyser J W M 1903-1
Decimal equivalents Evens A C M 1903-1
Descriptive notes on the South Indian Railway Mather A M 1903-1
Rail joints Jelley S E M 1903-2
Accidents and how to act Genders W M 1903-2
Points and crossings Poyser J W M 1903-2
Notes on design of diamond crossings with double slips Colquhoun J A M 1903-2
Transition curve tables Cudworth W J Pat 1903-2
South African railways during the Boer War 1899/1900 Taylor J E  - 1904-1
Adoption of timber for sleepers, and comparative value of different timber Bloyd F G Pat 1904-2
Covering in of point rods and signal wires McLewin S E M 1904-2
History of railway permanent way Stretton C E HM Ed 1904-2
The Uganda Railway and its construction Miller Scott G W M 1904-2
The Westinghouse electro-pneumatic system of signalling Malan E de M Pat 1904-2
Notes on the Gold Coast Railway Stewart E J M 1904-2
Chairing sleepers Jones T   M 1904-3
Proposed system for obtaining relative position of crossings by diagram Taylor B T M 1904-3
Permanent way accounts Cooke J T AM 1905-1
Pile driving for foundations Taylor J E M 1905-1
Coal workings under a railway Stretton C E HM Ed 1905-1
The training and position of the platelayer Hopes G AM 1905-1
British Standard Steel Rails Stretton C E HM Ed 1905-1
The Little Eaton Outram-way anon  - 1905-1
Electrified permanent way Ridley T VP M 1905-2
Railway painting Coltman W AM 1905-2
Electrification of the Metropolitan Railway Gower G F  - 1905-2
Excessive use of figures in laying permanent way Bradley B L Pat 1905-2
Calculation of angles by various methods Johnson J M 1905-3
Permanent way on a private railway Grant R B M 1905-3
Technical education among platelayers Workman W M 1905-3
To find angles of crossings Ridley T M 1905-3
Simplification of British weights and measures Male E P HM 1905-3
Permanent way rail joints Cornwell J M 1905-3
Drawing scales explained Swindells E J J AM 1905-3
Permanent way inspection anon  - 1905-3
Terms employed in the solution of permanent way problems Henry W S 1906-1
Rack railways Fletcher C H M 1906-1
The permanent way of the Baker Street and Waterloo Tubular Railway anon  - 1906-1
Description of the Crumlin Viaduct Cleaver W AF 1906-2
Breakdowns and emergencies Baines J C AF 1906-2
The accident at Charing Cross (SECR) Station roof Bennett D R AF 1906-2
Rail joints Hughes G AM 1906-2
Railway drainage+A33 Fletcher C H M 1906-2
Setting out and laying down of point and locking bar connections Hollands C L AM 1906-2
Visit to the W R Sykes Interlocking Signal Company McLewin S E M 1906-2
Finding the position of crossings on straight roads Sutton R AM 1906-2
NER's new goods station and warehouse at New Bridge Street, Newcastle Nichol A M 1906-2
The action of 6-wheel coupled engines in passing through points and crossings Williamson W R M 1906-2
The new Victoria Station London, LB&SCR Willox W F 1906-3
The Sirhowy Valley, South Wales Meredith W L LM PP 1906-3
The King Edward Bridge, Newcastle-upon-Tyne Cameron A AF 1906-3
A modern railway telegraph construction survey Packham S E M 1906-3
Recollections of 61 1/2 years on a railway Rolfe W M 1906-3
Use and method of fixing compensators in point rodding Farr W J M 1906-3
Defects and perfection of permanent way Ridley T M 1906-3
The construction of railway formations Hopes G AM 1906-3
The Roadmasters' Convention in America, 1906 Camp W M M 1906-3
The Fareham Tunnel and Deviation Line Treacher E M 1906-3
International Railway Congress Washington 1905 anon  -  1906-3
The strengthening of rail joints Hull W B S 1907-1
The inspection of iron bridges Eggleton G M 1907-1
Experiments with reinforced concrete ties in America Camp W M M 1907-1
Fog signalling, and a suggestion Noble W  - 1907-2
GS&W Railway stone crushing plant, Laffan's Bridge Prideaux F G AF 1907-2
The Pilsley Colliery Kirkby J AF 1907-2
The construction of crossings Scott H M 1907-2
Castings for railway work giving some foundry methods, their production & defects Sutcliffe R N AM 1907-2
The best way to lay in or relay curves Parker D M 1907-2
Signal Department work. Fixing point connections, detecting facing points Russell E M 1907-2
Principles of trigonometry as appiled to solution of permanent way problems Cleaver W AF 1907-3
Effect of surface water on ballast and drainage, when on shale Johnson J M 1907-3
Problems connected with the laying-in of three-throws Mason J M 1907-3
Distant signals Wooldridge M W M 1907-3
Visit to Messrs. Siemen's Works at Charlton Gower G F M 1907-3
Twist drills for use on permanent way and length gangs Genders W M 1908-1
Tabulated knowledge of an inspector's district Hartley Fletcher C M 1908-1
Bridge construction Butler W AM 1908-1
Roadmasters' Convention USA 1907 Camp W M M 1908-1
Some notes on acetylene and its application to portable lamps Jackson A AF 1908-2
Points and crossings Genders W M 1908-2
The clerical work of a permanent way inspector Richardson R C AM 1908-2
Interlocking Taff A W AM 1908-2
Board of Trade requirements in regard to the Opening of Railways  -  - 1908-2
About Manila and the making of the Manila Railway Willox W AF P 1908-3
Some notes on the application of electricity to Tubes and Railways King C A F 1908-3
Neasden Power Station and the electrical working of the Metropolitan Railway Jones C F 1908-3
Transition curves on railways Robarts H E AF 1908-3
Visit to signalling installation at Earls Court Junction, Metropolitan District Railway Packham S E / Every W S  M / M 1908-3
Connections of mechanical signals Hollands C L AM 1908-3
Railway fog signalling Hillier L AM 1908-3
The wear of rails Scott H M 1909-1
Movable crossing tongues, heel-less switches and spring crossings Ridley T M 1909-1
Fencing Jeffery F A M 1909-1
Snow blocks on railways Fraser W M 1909-1
Crossing and junction leads, and the setting out of curves Taylor J E M 1909-2
Work and wages Newhook A E AF 1909-2
The ferro-concrete jetties at the New King's Dock at Swansea Cleaver W AF 1909-2
The new ferro-concrete bridge at Pontypridd, and the new station Cleaver W AF 1909-2
Rail creep Lemaitre M M 1909-2
Degrees of curvature, and their use to practical platelayers Mather A M 1909-2
A lecture on steel McWilliam Prof A HLF 1909-3
Automatic signalling as installed on the Metropolitan District Railway Every W S M 1909-3
Piles, their relative value Jeffery F A M 1909-3
The maintenance of the permanent way exposed to the sea Lawford G M 1909-3
The elementary principles of interlocking Lewis L P AF 1909-3
Treadles or rail contacts Gower G F M 1909-3
The permanent way of electric tramways Booth H M 1909-3
Some aspects of railway nationalisation Robertson J R HLF P 1910-1
Mechanical signalling work Russell E M 1910-1
Roadmasters' Convention USA 1909 Camp W M M 1910-1
Notes on house drainage and a system of sewage disposal for isolated houses Wright A M 1910-1
The rolling of steel rails Baird J O  - 1910-2
Slips (embankments) Petrie J F 1910-2
Trenail extraction Fox W E AF 1910-2
The relaying of permanent way: its probable cost Moore M M 1910-2
The drainage of permanent way Dolding W M 1910-2
Some benefits of association Camp W M M 1910-3
Notes on platelaying Bassindale H H AM 1910-3
The moving of brick and other buildings Burgoyne D M 1910-3
A method of obtaining any given clearance between knuckle of wing rails Lee T M 1910-3
Signal lighting Gowans W M 1910-3
Appliances for handling and stacking permanent way materials Cochrane J M 1910-3
The demolition of arch bridges Workman W M 1910-3
Solution of a double tangent junction Genders W M 1910-3
Notes on permanent way on tube railways Stubbs A AM 1910-3
Fog signalling. A railway problem and its solution Fraser W M 1910-3
Comparisons of British and American permanent way Melville W F P 1911-1
Methods of bridge renewals Walker W M 1911-1
Corrugations or roaring rails Booth H M 1911-1
Level crossings Piper W M 1911-1
Roadmasters' Convention USA 1910 Camp W M M 1911-1
The engineer's building depot Holloway H G AM 1911-1
The Metropolitan Railway Roberts C H AF 1911-2
The creosoting of timber Packham S E   M 1911-2
Southampton Docks Clark J F  - 1911-2
Permanent way details Melville J W AF 1911-2
Electricity as an adjunct to mechanical signalling Morgan H E AF 1911-2
Renewal of viaducts Thompson W AM 1911-2
Junctions for high speeds MacGregor C AF 1911-2
Notes on the permanent way of railways Rutherford D L F P 1911-3
The making of a good cartway in Coal and Goods yards French C M 1911-3
Swing bridges Alexander J AF 1911-3
Reversible working line, LB&SC Railway (Bricklayers Arms) Hollands C L M 1911-3
Paints and painting Dunn J AM 1911-3
Scaffolds for repairs and light works Wright A M 1911-3
The construction of crossings Treacher E AF 1911-3
Reminiscences of railway work in India Benedict E AF 1911-3
Rotation locking Healey G M 1912-1
The duties of a permanent way inspector Pollock D M 1912-1
Straightening and plumbing walls etc Skilbeck F AM 1912-1
Roadmasters' Convention USA 1911 Camp W M M 1912-1
The effect of heavier loads on the life of bridges Renwick F A AF 1912-1
The 1912 summer convention McLewin S E M 1912-2
Barrow Docks and Harbour Mason T D AF 1912-2
Wear and tear of permanent way Newlands A AF 1912-2
Bridge renewals on the South Indian Railway Huss P L M 1912-2
Some observations on the Presidential address Scott H M 1912-2
The intellectual improvement of members Taylor J E M 1912-2
The detection of switches Way H C S 1912-2
Hand cranes, the construction and handling of same Hanney F M 1912-3
Cab signalling (1) Dammond W H F 1912-3
Permanent way material, stock for repairs Marshall A D AM 1912-3
Method of raising girders to renew bed timbers Doran A H M 1912-3
Rubber cushion chairs Aston F AM 1912-3
The electrification of the LB&SC Railway Dawson P  - 1913-1
Rail creeping Treacher E AF 1913-1
The construction of railway halts Janes H AM 1913-1
Roadmaster' Convention USA 1912 Camp W M M 1913-1
Cab signalling (2) Dammond W H F 1913-1
Track beds and ballast Randell W M 1913-1
The deduction of the crossing lead formula Westwick A L AM 1913-1
The wear of rails Sanderson P M 1913-2
The duties of a district signal fitter Ferguson J AM 1913-2
The packing of rail joints with metal liners Hughes G AM 1913-2
Taking the speeds of trains over restricted curves or junctions Baron J M 1913-2
Selection of timber Naylor G M 1913-2
Permanent way appliances in use on the NER Rudgard H J F 1913-2
Slack gauge in turnouts McKay D M 1913-2
A century of railway developments in South Wales and Monmouthshire Meredith W L PP 1913-3
Junction alignment McMurdo A H AF 1913-3
Track circuiting, a safeguard to railway signalling Dyke A W M AM 1913-3
Methods of relaying in single and double tunnels Taylor G M 1913-3
Gauging overstructures to the running lines Macdonald J A / Whitehouse C M A AM / AM 1914-1
The drainage of masonry viaducts Wright A M 1914-1
Permanent way renewals, and Newcastle Crossings Ridley T M 1914-1
Roadmasters' Convention USA 1913 Camp W M M 1914-1
The Wimperis Accelerometer or Equilibristat anon  - 1914-1
Trolley working in China Clear A C VP 1914-1
The French train runnings Willox W A AF 1914-2
Impressions of the Paris Convention Cleaver W F P 1914-2
Indian railways, track for trunk line traffic Leslie Sir B  - 1914-2
Strengthening of bridge on SECR over Borough Road & Southwark Bridge Road Waight E R F 1914-2
Birth and growth of roads and railways Kirk H F 1914-2
Regulating curves by chords Taylor G M 1914-2
The solving of double line junctions, half leads and crossover roads Westwick A L AM 1914-3
Roadmasters' Convention USA 1914 Camp W M M 1914-3
The construction of motor halts Quick F AM 1914-3
Short rails for inside rails of curves Ridley T M 1914-3
Rails for electric railways Willox W A AF 1914-3
Trigonometry as applied to permanent way calculations Cleaver W F P 1915-1
Modern layout of track circuits and signals in use on the Metropolitan Railway Challis W M  1915-2/3 
Manganese steel crossings; Praed Street Junction, Metropolitan Railway Haines C M  1915-2/3 
Duties of a platelayer, practical hints on use and care of materials Hughes G AM  1915-2/3 
Practical application of the line and square Taylor J E M 1916-1
Some points of contact between permanent way and signalling Hutt G G M 1916-1
Tube tunnelling Thomas R W  - 1916-1
Roadmasters' Convention USA 1915 Camp W M M 1916-1
Stone ballast plough Brown L W AM 1916-1
High explosives: their history and manufacture, and their application to railway work Cleaver W F P 1916-2
A junction realignment job Treacher E AF 1916-2
Railway engineering in Greenock district Grant J W AF 1916-2
Further notes on the solving of double line junctions Westwick W L AM 1916-2
Neath River Swing Bridge - signalling and interlocking arrangements Dyke A W M AM 1916-3
Improved jim crow for bending wing rails Lee T M 1916-3
A method of lining out points and crossings with string lines Hayes J M 1916-3
Engineer's work with a small loco crane Moore M M 1916-3
Notes on sleepers and permanent way timber Pugh A G AF  1917-1/2 
Renewal of viaduct over River North Esk at Marykirk Fraser W M  1917-1/2 
Materials Wright A M  1917-1/2 
Painting girders Brackstone V E H M  1917-1/2 
Roadmasters' Convention USA 1916 Camp W M M  1917-1/2 
The rational design of reinforced concrete wharves and jetties for wet docks Cleaver W F P 1917-3
Track circuiting of railways Cowan H M 1917-3
The modern British railway - inception, construction and maintenance Seaton T H AF 1917-3
Methods of dealing with railway formation in clay cuttings Chappell J H M 1917-3
First principles of stresses Workman W M  1918-1/2 
Hand point levers Treacher E HLF  1918-1/2 
Roadmasters' Convention USA 1917 Camp W M M  1918-1/2 
Duties of a signal linesman Kirk H AM  1918-1/2 
Reballasting permanent way Moore W M  1918-1/2 
Tramway track, 1883 to 1913: or 30 years of tramway practice Bland F F 1918-3
Concrete railway sleeper blocks Meyrick W H  - 1918-3
Elementary platelaying Lattimer J G  - 1918-3
Adjusting rails Hughes G AM 1918-3
Roadmasters' Convention USA 1918 Camp W M M 1918-3
Skew rail joints Janes H AM 1919-1
Bevelled joints Haines C M 1919-1
Simple mechanics for signal maintainers Lewis L P AF 1919-1
Minor derailments Langley A E AF 1919-1
The theory of super-elevation Honeybourne H C AM 1919-1
The River Clyde and its developments Donald P D F  1919-2/3 
Engineer's Department maintenance on the underground railways Cooper A R F  1919-2/3 
Pages from 52 years of railway life Hopes G M  1919-2/3 
Roadmasters' Convention USA 1919 Camp W M M  1919-2/3 
Alterations to a coal staith foundations and spout raising gear Rutter H M 1920-1
Suggestions regarding the manufacture of railway crossings Hughes G AM 1920-1
Standardisation of permanent way materials on British railways Tompkins F M 1920-1
The inner structure of steel anon  - 1920-1
Instruments and machines for measuring the wear of rails Langley A E AF 1920-2
The use of mechanical appliances for relaying and other permanent way work Davies T M 1920-2
Theory versus practice Grant J W AF 1920-2
The heat treatment of steel anon  - 1920-2
Home railways - the reconstruction of ways and works Fletcher B P AF 1920-3
Roadmasters' Convention USA 1920 Camp W M M 1920-3
A few notes on creosoting sleepers Willis J B AM 1920-3
Labour saving and safety appliances  LNWR  - 1920-3
The Lethbridge Viaduct, Canada anon  - 1921-1
Automatic train control Thorrowgood W J  - 1921-1
Broken fishplates Honeybourne H C AM 1921-1
The relative advantages of the different types of chair fastenings Carpmael R F 1921-1
Railway reconstruction of the Belgian State Railways and Ghent Station anon  - 1921-2
Replacing a large truss bridge by lateral movement Miller J  - 1921-2
Equating the work of permanent way maintenance Wallace W K F 1921-2
Mechanical locking Moseley J M 1921-2
Railway construction, points for new works inspectors Winyard T M 1921-3
Electrification of the L&SW Railway suburban lines Wheeler D M 1921-3
Timber and its uses Walker A  - 1921-3
Railway painting and glazing, a suggested means of economy Bell J G M 1921-3
Tables for point and crossing work Lawson G AM 1921-3
Setting line stakes on existing railroad curves by middle ordinates (USA) Snyder G W  - 1921-3
Rail corrugation Bindley Capt H D AF 1921-3
The Burma railways Hicks A C F 1922-1
The PWI as an educational force Cleaver W F PP 1922-1
Improvements of railway curvature by instruments Chester H W AF 1922-1
Railway curves and expansion Ridley T M 1922-1
Ryde Pier and Isle of Wight railways 1878 - 1921 Benedict E / Treacher E F / HLF 1922-1
Use of a wire in relaying, methods of renewal Minnis H AM 1922-1
American practice in construction of reinforced concrete roads Bendall R L F 1922-2
Mechanical track construction and maintenance Clougher N M F 1922-2
Points and crossings Hall H W F 1922-2
Track circuits Thorrowgood W J F 1922-2
Double crossover or scissors crossing for Staiths Work Wagons Thompson J T AM 1922-2
Remarks on equating of permanent way lengths Bassindale H H M 1922-2
Some facts about the construction of the London Tube railways Dalrymple-Hay H H  - 1922-3
The renewal of bridges Fletcher B P AF 1922-3
Road making and repairs Bryant H W M 1922-3
Out-of-gauge loads and structure gauges Appleyard T AF 1922-3
A brief description of the Sierra Leone Government Railways Poxon J L M 1922-3
Detection of switches, compensation of point rods and switch rods Moseley J M 1923-1
Anti-malaria drainage for railway engineers employed abroad Lawson S F 1923-1
The telephone Dyke A W M M 1923-1
Practical hints on permanent way maintenance in Malaya Cornwell J G AF 1923-1
Reconstruction of part of North Quay, Lowestoft Inner Harbour Hawkins L E AF 1923-2
Some experiences of the Hallade Register, and method of adjusting curves on LNER Train J C L AF 1923-2
The filling in of a viaduct Gibson E AF 1923-2
The use of tables of points and crossing dimensions Hepworth W A AF 1923-3
Automatic telephones for railway working Thorrowgood W J F 1923-3
The maintenance of railway tunnels Butland W E M 1923-3
Fishplates on the Federated Malay States Railways Walker Capt R D AF 1923-3
Fastenings rails to sleepers Stuart A R F 1923-3
The steel rail from the Ore Mine to the track Allen Cecil J AF 1924-1
Penang Hills Railway Johnson A R  -  1924-1
Coal workings and subsidence Knight J W AF 1924-1
The Gold Coast Railways Hickford W A H M 1924-1
Repairs to a 100-ton steam derrick crane Grant J W AF 1924-1
GWR standard permanent way practice Bowler F T AF 1924-2
The manufacture of railway chairs Patterson R O VP 1924-2
Colliery subsidences Statham I C F  - 1924-2
The future and possibilities of the Institution Butland W E M 1924-2
A precast reinforced concrete railway underbridge Quick F AM 1924-2
Notes on West African 3ft 6in gauge railways Poxon L J  M 1924-2
The construction of electrified lines & South Gosforth new Car Sheds Marsh W M 1924-3
Track maintenance and renewal Gibson C W AF 1924-3
Layout of point and signal connections Cocking J W AM 1924-3
"Churning" of timbers and sleepers Hughes G M 1924-3
A new chapter in the history of permanent way Leslie Sir Bradford F 1925-1
Some points for the permanent way dept. during the electrification of a steam railway Newell R B F 1925-1
Boundary fences Randell W M 1925-1
A century of permanent way Bland F P 1925-2
An account of the construction of the Kassala Railway, Sudan Bindley H D/Greenfield M O AF / AF 1925-2
Permanent way folk of Southern India Stuart A R F 1925-2
Accidents - what to do and what not to do Stimpson C H M 1925-2
Self-acting inclines in Northumberland and Durham Appleyard T AF 1925-3
Washouts at Ula Yam on the Federated Malay States Railway, May 1924 Walker R D AF 1925-3
Circular curves and first principles of permanent way calculations Langley A E AF 1925-3
Brickwork and concrete Butland W E M 1925-3
The wear and tear of permanent way Fletcher B P AF 1926-1
The Tanganyika Railway and its permanent way Cock H G AM 1926-1
Balkan railways Willox W A  AF 1926-1
The lengthman - his duties and difficulties Wensley F AM 1926-1
The maintenance of waterways to docks and harbours Carpmael R / Morgan H W F / - 1926-2
Diagrams for ascertaining junction leads and radii Gurd R AF 1926-2
Tools Squance W B M 1926-2
Permanent way maintenance Hepworth W AF 1926-2
Level crossings and gates Donson J H AM 1926-3
Repairing and strengthening of metallic bridges by means of ferro-concrete Cueritte T J / Bryce T H  - 1926-3
Quarries and quarrymen Mitchell R M 1926-3
Notes on the modern extension of the London Electric Railways Janes H AF 1926-3
Relaying of electrified tracks in tunnels of the Mersey Railway, and automatic signalling Blackburn G M 1927-1
Relaying a double scissors crossover road, Newport Park Junction Stephen G M 1927-1
Drainage of bridges Lloyd Davies B M 1927-1
Timbered roads on underbridges Barker W J AM 1927-1
Reconstruction of a Cornish viaduct Butland W E M 1927-2
Sinking cylinders by compressed air Price W W AM 1927-2
Economics in expenditure, Engineering department Soundy D F AF 1927-2
The engineering aspects of road competition Fletcher B P AF 1927-3
Floods in Pahang 1926, and subsequent repair works Cruickshank J AF 1927-3
Relaying the Central Line Tanganyika Railways from Dar-Es-Salaam to KP 217 Cock H G AM 1927-3
Method of changing points, crossings and timbers in a terminal yard Carn G AM 1927-3
Repairs to bridges Stephen J M 1927-3
Ballast and ballasting Treacher E HLF 1928-1
Ballast and ballasting Tazewell B M 1928-1
Ballast and ballasting Taylor J E AF 1928-1
Inspection and repair pits for railway rolling stock Wolstencroft J AM 1928-1
Paint and painting Gravatt W AM 1928-1
The song of the rails "The Times"  - 1928-1
Points of common concern to Engineering and Locomotive departments Bowler F T / Holcroft H AF / - 1928-2
Complete renewal of plain line - lumping method Bradley E S AF 1928-2
Complete renewal of plain line - piecemeal method Appleyard T AF 1928-2
Main line electrification in France Maitland J P AF 1928-2
Lead strip apparatus for obtaining section of rails Langley A E F   1928-2
Blowing up a bridge Kent G F AF 1928-2
Lifting and packing Tazewell B M 1928-3
Lifting and packing Carn A AM 1928-3
Recent French railway construction Willox W A  AF 1928-3
Adjustment of curves Bassindale H H M 1928-3
Timber way beams on bridges and staiths Rutter H M 1928-3
Technical education for the permanent way staff Butland W E M 1929-1
The technical education of permanent way men Dyke A W M M 1929-1
Technical training of the platelayer Taylor J E AF 1929-1
Some aspects of permanent way in Japan Tamiya Nagata F 1929-1
Notes on American railroad practice Alexander H A AF 1929-1
The changeover from mechanical to colour light signalling at London Bridge Station Challis W AF 1929-1
Steel sleepers for home railways Bayley J P  - 1929-1
Relaying with pot sleepers Seshadri T K AM 1929-1
Steel sleepers on colonial railways Spiller J W F 1929-2
Recent work on the Royal Albert Bridge, Saltash, GWR Butland W E M 1929-2
The life and work of a ganger Ledger H AM 1929-2
Kings Cross passenger station alterations and improvements 1927 and 1928 Dobson W A AF 1929-3
Tramway permanent way Shaw D D F 1929-3
The construction of the Tabora - Mwanza Line, Tanganyika Railways Cock H G Jnr AF 1929-3
Newhaven Swing Bridge, renewal of race frame or roller track Perrin E J M 1929-3
The Belgian Railways Pearson H M  -  1930-1
Universal diagrams for ascertaining junction leads and radii Gurd R AF 1930-1
A new chapter in permanent way maintenance Bender O F C F 1930-1
Heavy current return rail bonding Bujama H  -  1930-2
The manufacture and inspection of permanent way materials Quartermaine A S   -  1930-2
Engineer's Department, stock records and accounts Holloway H LAF 1930-2
Acetylene lighting of tunnels, railway trucks, etc. Dobinson, H M M 1930-2
The G.W.R. new station, Newport Bryant H W M 1930-2
Up-to-date railway maintenance Hills H  -  1930-3
Profiling and measurement of wear on railway rails Callaghan R C  -  1930-3
A ganger's Time and Charge sheet Marshall A D  -  1930-3
Superelevation and spacing between check rails Gurd R AF 1930-3
Steel sleepers in the Sudan Walker J C F 1930-3
Stone ballasting Beckinsale F T M 1930-3
Rail creep Bassindale H H M 1930-3
Engineer's department accounting Knotts J H AF 1931-1
Permenent way maintenance by machinery Brinsmead K AF 1931-1
The building up of worn railway crossings by electric welding Harrison F E  -  1931-1
Military railways - Egyptian Expeditionary Force Frazer I R  -  1931-1
Docks maintenance at the Eastern Area (GWR) Ports Lakeman H G AF 1931-1
Maintenance of permanent way Tazewell B M 1931-1
Wear and tear of rails on London Underground Railways Robertson V A M F 1931-2
Methods of temporarily supporting tracks during operations underneath Bowler F T   AF 1931-2
Recent developments in the application of electric arc welding Gardner E P S  -  1931-2
Minor derailments Redding W M 1931-2
Railway engineering in the Alps Allen Cecil J AF 1931-3
Permanent way work and its relationship to the industrial and transport problem Lawson F AF 1931-3
Modern maintenance of permanent way McDougall M M 1931-3
Laying in points and crossings with steam crane Dugay S M 1931-3
Nature versus maintenance West J BF AM 1931-3
Fire, its causes and methods of extinction Elmes G  -  1931-3
Modern trends in permanent way maintenance and design Walker R D  -  1932-1
Manganese steel switches, crossings and rails Hill W T F 1932-1
Wooden sleepers in Sudan Walmsley H F 1932-1
Preservative treatment of timber in Sudan Thomson J AF 1932-1
The "Unit" steel sleeper and its manufacture Harvey A H  -  1932-2
Weight of rails Bindley H D F 1932-2
Railway signalling and traffic control systems Tattersall A E F 1932-2
Resignalling at St Enoch Station, Glasgow Bryson W H H  -  1932-2
Rail laying with small ramps Langley A E F 1932-2
The Engineer's Department, an economic viewpoint Sherrington C E R  -  1932-3
Relaying from a permanent way inspector's standpoint Tazewell B VP 1932-3
Automatic train control Crook G H  -  1932-3
Departmental cooperation Knotts L J M AF 1932-3
Slag ballast, production and distribution Lawson F AF 1933-1
The realignment of railway curves Furnival S L AF 1933-1
The conveyance of exceptional loads, GWR practice Bussell H J AF 1933-1
Modern tramway maintenance Shaw D D F 1933-1
Clay, its effect on railway construction and maintenance Seaton T H F 1933-2
Notes on Divisional bridgework Butland A N AF 1933-2
Reconditioning of worn railway crossings by the arc welding process Sheldon A W  -  1933-2
Level crossings Maycock M G AF 1933-2
The Liverpool Overhead Railway Box W L F 1933-3
American railway track Tratman E E R F 1933-3
Permanent way and the future Dawson J B AF 1933-3
Maintenance of underline structures Crisp J A M 1933-3
Duties of a permanent way inspector Gough L M 1933-3
Maintenance of electric track equipment and safety working Knotts R G M 1933-3
Systematic maintenance of permanent way on the LNER (NE area) Hills H AF 1934-1
The realignment and regrading of track in tunnels Rock L G B AF 1934-1
Some notes on permanent way metters Bassindale H H M 1934-1
Destroying weeds on railways by spraying Ledger H M 1934-1
The Railway Highway Newlands A PP 1934-2
Darlington Reclamation and Refettling Depot Hansell W C AF 1934-2
Darlington Reclamation and Refettling Depot reconditioning Brinsmead K  -  1934-2
Rail joints and broken fishplates Ketteringham R M 1934-2
Creosoting of sleepers Bowler F T F 1934-3
A survey of some signalling principles Jackson F S M 1934-3
Snowstorms and railway telegraphs Dyke A W M M 1934-3
Measuring up quantities in track work Thomas T J M 1934-3
Track tools in Sudan Cates F G M 1934-3
Ten years of progress in permanent way practice abroad Sherrington C E R  -  1935-1
The application of arc welding to permanent way work Pannell J P M AF 1935-1
Permanent way relaying costs Boyd D S 1935-1
Maintenance problems appertaining to permanent way on the LPTB Windmill H M 1935-2
Temporary packing of flooded track W heeler A AM 1935-2
Permanent way for a modern tramway system Greig L C  -  1935-2
A lengthman's appreciation of the weed-killing spray Jones S R AM 1935-2
Qualities and aims of a length ganger Williams H M 1935-2
Wear of steel in its application to steel rails McCance A  -  1935-3
Efficient surface treatment of roads consistent with economy Epton H M AM 1935-3
Measured shovel packing Kent G F AF 1935-3
Track maintenance Head W AM 1935-3
Kingswear and Dartmouth pontoon landing stages Weston W H AM 1935-3
The permanent way and the quest for speed Hepworth W F 1936-1
Rail and flange lubrication Cates F G M 1936-1
Superelevation   Bowler F T F 1936-1
Moving a building McCandlish F  -  1936-1
The work of a renewal ganger Clarke H W AM 1936-1
Track on clay formation Tyles A E/etc AM 1936-1
Rail joints   White W A C AF 1936-2
Work on a country length for a gang of six Pardoe A AM 1936-2
Some simple permanent way calculations Frieze M M 1936-2
Some notes on annual sleeper inspection Mackenzie-Brown W H VP 1936-2
The many and varied uses of the "Duff" jack Oliver D A AM 1936-2
Some notes on the maintenance of permanent way Peck J N AF 1936-2
The chair key Pitt C AM 1936-2
A few observations on permanent way work Ketteringham R M 1936-3
Cementation for railway maintenance Wall W M AM 1936-3
Daily routine of Permanent Way Inspector on the East Indian Railway Denny J T  -  1936-3
The manufacture of points, crossings, and components Wilson W AM 1936-3
Permanent way material, stocks and usage Simmerson B J AF 1936-3
Some aspects and problems in conveyance of exceptional loads by rail Bussell H J AF 1937-1
The Rule Book, a peep into the past Unwin G M 1937-1
Relationship between the permanent way and the locomotive Pearson H M AF 1937-1
Alignment of railway tracks Ledger H M 1937-1
Permanent way workers and maintenance Wensley F AM 1937-1
Welded rail joints Somerville T J AF 1937-2
Switches and crossings of the BS section Alley D S VP 1937-2
Relaying, preparation work of a length and relaying ganger Kear O AM 1937-2
The application of oxy-acetylene welding to track work Dore R E  -  1937-2
The evolution of permanent way Lee Charles E AF 1937-2A
Station and junction layouts Sheldon A W AF 1937-3
Elementary railway signalling Dyke A W M M 1937-3
Disintegration and decay of brickwork Wolstencraft J M 1937-3
The methods employed in handling the first 120 ft rails rolled and laid Herbert C C B  -  1937-3
The drainage of permanent way Sanders J AM 1937-3
Current practice and experiments on the LMSR Wallace W K PP 1938-1
Standard track of Western Europe/American railways - comparison with British Sherrington C E R F 1938-1
Examination of bridges from the permanent way man's standpoint Garnett J M 1938-1
Measured shovel packing Fraser I R AF 1938-1
Permanent way tools - uses, abuses, and dangers to be avoided Rose F  -  1938-1
Curves - obtaining and maintaining alignment and superelevation Dunstan W G AF 1938-2
Modern signalling in relation to the permanent way Nock O S  -  1938-2
A visit to a steel rolling mill Williams E T AF 1938-2
Paint Warren F AM 1938-2
Weed-killing on railways Viner Brady N E AF 1938-2
The Severn Tunnel, its care and maintenance Alexander H A F 1938-3
The assembly and relaying of points and crossings by steam crane Perfect A M 1938-3
The electrified area of the South Indian Railway and its maintenance Harben J E M 1938-3
The reconstruction of main line bridges under traffic Driver E F  AM 1938-3
Rerailing and renewal of track in tunnels with 180 ft rails Dugay S M 1938-3
Temporary bridging during reconstructions and alterations Reynolds H R AF 1939-1
Mining subsidence on the railway Smith M G R AF 1939-1
Flat bottom track on the LMSR Swinnerton N W AF 1939-1
The erection of a modern precast concrete footbridge Garnett J M 1939-1
Permanent way metallurgy Turner T H F 1939-2
Track defects - their prevention and cure Whiteley J W AM 1939-2
Some notes on the use of steel sleepers Carpmael R PP 1939-2
Service observations on the rusting of steel sleepers Hudson J C  -  1939-2
Steel sleepers for bullhead rail track Thomas T J M 1939-2
Relaying and maintenance of steel sleeper tracks Easty A M 1939-2
Maintenance of steel sleepered track Carn A E M 1939-2
Permanent way drainage Coward R E AF 1939-3
Supply of permanent way materials, LMSR Hickman P R AF 1939-3
Federated Malay Straits Railways, recent track developments Cruikshank J AF 1939-3
Impact on railway underbridges Rigby W L AF 1939-3
From track to scrap heap Hutt E T AF 1939-3
Reconditioning of steel sleepers by electric arc welding Duncombe Bindley H F 1940-1
Structural defence Warren H E S 1940-1
Reinforced concrete bridges Beatty W F AF 1940-1
Sand dunes and drift sand, Port Sudan Line Ahmed Eff Fadl AM 1940-1
Sand dunes   Ahmed Eff Mustafa El Hag AM 1940-1
Materials under trial on the LMSR (Part 1) Swinnerton N W AF 1940-1
The question of substitutes for timber sleepers anon  -  1940-2
Flood damage, North Wales District, LMSR Chaplin C J F 1940-2
Dismantling a granite overbridge at Madura, South Indian Railway Rajagopalan N M 1940-2
Materials under trial on the LMSR (Part 2) Swinnerton N W AF 1940-2
The West Highland snowstorm Jan/Feb 1940 Rattray R C AF 1940-2
Space, time and the Engineering Dept., some notes on speed, gradients, curvature Hutt E T AF 1940-2
Electric arc welding on structures of London Transport Clark H W F 1940-3
Relationship between the track and the locomotive Pearson H M AF 1940-3
Strengthening of tunnel, Castle Rook & Casonzol, Madras & S Mahratta  Railway Sitaram J M 1940-3
Effect of heavier traffic on permanent way and works anon  -  1940-3
Repairing damage by bomb Smith W E / Colebrook F H  - / - 1940-3
The history and construction of diving apparatus Johns W D AF 1941-1
Some useful permanent way hints Allen G AM 1941-1
Reinforced concrete construction for small jobs Beatty W F AF 1941-1
Structure clearances Hammett R A AF 1941-1
Standard gauge in the USA Lee Charles E AF 1941-1
Problems in railway construction in the Far East Honderlink E R  -  1941-2
A bogie bridge anon  - 1941-2
Emergency organisation for bomb damage repair work, London Transport Edrich A C AF 1941-2
LPTB, the work of the building department with some notes on bomb damage repairs Woolcombe J F  - 1941-2
War-time method of timbering Mack J M 1941-2
Oxygen cutting Dore R E AF 1941-2
Some notes on LNWR track Lee Charles E AF 1941-2
Concrete sleepers on the GWR anon  -  1941-3
Temporary platforms, footbridge and platform shelters for war-time use anon  -  1941-3
The Penmaenmawr granite quarries anon  -  1941-3
The duties and responsibilities of an Assistant Engineer Chaplin C J F 1941-3
Anchoring track to meet present day conditions (USA) anon  -  1941-3
Reconstruction of Town Bridge, Mountain Ash Reynolds H R AF 1941-3
Radius - versine constants Lloyd Owen A AF 1942-1
American Permanent Way Convention Tratman E E R F 1942-1
Sleepers and crossing timbers, selection, treatment, and utility Lund H F 1942-1
Experiments in underpinning and strengthening unstable track, GIP Railway, India D'Costa A V AF 1942-1
The troubles and pleasures of a District Engineer Adams F G T F 1942-1
A new rail joint (Ellson) anon  -  1942-2
The use of tables Douglas H L AF 1942-2
Concerning sleepers and timbers Swinnerton N W AF 1942-2
Spring crossings Booth R G AF 1942-3
Some aspects of the yearly relaying programme Barsdale A F N  AF 1942-3
Something new in sleepers Fletcher B P F 1942-3
Points and crossings maintenance Letman A E AM 1942-3
Concrete sleepers, transverse and block types Kitchin T E M 1942-3
Notes on some current permanent way topics Harrison F E P  1943-1
Ancient Lights, Act of Ownership, Private Streets Works Act 1892 Davis E O  -  1943-1
Some further aspects of maintenance of permanent way Atkinson F M 1943-1
The steel rail, past, present and future Allen Cecil J AF 1943-2
A talk on manual permanent way tools Wensley F AM 1943-2
Timbered layouts Adams D V AF 1943-3
Departmental collaboration, during and after aerial bombardment Maitland J P AF 1943-3
Notes on harbour reconstruction work Briggs A E AF 1943-3
A brief history of manganese steel Brooks T H AF 1944-1
The organisation and work of a relaying gang Broadhurst H AM 1944-1
The organisation and work of a maintenance gang Proctor T H AM 1944-1
The effect of water upon the construction and maintenance of railways Alexander H A F 1944-1
Methods of prolonging the life of rails Muirden A S  F 1944-1
Railways after the war Willox Maj W A PP 1944-1
Diamond Jubilee Souvenir Foreword Robertson V A M F P 1944-2
The Permanent Way Institution Janes H Sec 1944-2
British permanent way 1844 - 1884 - 1944 Sherrington C E R F 1944-2
Recent innovations in track maintenance and design Wallace W K F PP 1944-2
Welding as appiled to modern railway permanent way practice Croom-Johnson P F 1944-2
The permanent way man's job in India Muggeridge H C F 1944-2
A review of signalling progress Horler F  -  1944-2
Wartime emergency repair Lee Charles E F 1944-2
Fires in banks and tips Alley D S AF 1945-1
Borough Market Jc SR, recent relaying with cast manganese steel crossings Carr D P AF 1945-1
Lifting of track Fenner E M 1945-1
Soil mechanics and the permanent way man Reynolds H R AF 1945-2
"Hunting" of railway rolling stock and locomotives Toms A H AF 1945-2
The painting of structural steelwork Gayes Maj C E F 1945-2
Accidents Moore J L M  -  1945-3
Railways and the "V" bomb attacks Lee Charles E F 1945-3
Rail lubrication Lloyd Owen A AF 1945-3
Diploma examination papers, A & B, 1945 anon  -  1945-3
How rails break Dinsdale C AF 1946-1
Construction and maintenance of permanent way on London Transport railways Dunton C E F 1946-2
Maintenance of the permanent way by welding Harding W E AM 1946-2
FB track - design of switches and crossings in 110 lb BS FB rail Ormiston H AF 1946-2
Blanketing of track Treacher D C AF 1946-3
Personal viewpoint concerning the Chief Civil Engineer's Department Moore E J M 1946-3
Diploma examination papers, A & B, 1946 anon  -  1946-3
Railway civil engineering as a career Robertson V A M F P 1947-1
Authorised relaying on the LMSR Best W H F 1947-1
The human element in relation to railway engineering Train J C L P 1947-2
Pre-assembly track laying, Southern Railway Belsham W AM 1947-2
Improvements to point and crossing layouts Mansbridge J AF 1947-2
Railway bridging in the Ruhr 1945 Evans H AF 1947-2
Diploma examination papers, A & B, 1947 anon  -  1947-3
Maintenance of a London Engineering Division King C W /others  -  1947-3
A standard renewal of way method Howlett L T AF 1947-3
Maintenance problems of a length ganger Thompson W M 1947-3
The railways under Nationalisation Train J C L F P 1948-1
Concrete sleepers Swinnerton N W F 1948-1
Careers of great permanent way men Sherrington C E R F 1948-1
Reconstruction of the Roe Viaduct (Derry) Cain N C F 1948-1
Colour light signalling Damon A W  -  1948-2
The use and misuse of concrete Pearson H M AF 1948-2
Management at the work level Coombs D H AF 1948-2
Railway construction in Italy 1943 - 1946 Barnwell F R L AF 1948-2
Diploma examination papers, A & B, 1948 anon  -  1948-3
Formation - its natural stability and support Speed P H AF 1948-3
Concrete practice, design and control of concrete mixes Blyth R C AF 1948-3
The GWR system of Automatic Train Control Dymond A W J AF 1948-3
The President visits some of the sections Taylor Thompson J P 1949-1
How the permanent way should be maintained Looney C M 1949-1
The manufacture of permanent way materials Lloyd R T  -  1949-1
Mechanised permanent way maintenance and renewals Triffitt E L F 1949-1
The railways of the Anglo-Egyptian Sudan Harwood F L AF VP 1949-1
Differences between British and Irish permanent way practice Plumer A M F 1949-2
Winter and railways Paterson W VP 1949-2
Road construction and maintenance Glennon N G AF 1949-2
The Southern Region track laying machine West J D AF 1949-2
Oxy-acetylene cutting Walters D J AM 1949-2
Trackwork on the Reichsbahn Orchard H C AF 1949-2
Mechanical plant and equipment Ticehurst A G AF 1949-3
Painting Rowlands L M 1949-3
Track inspection reports Howlett L T AF 1949-3
Completing the visits to the sections Taylor Thompson J P 1950-1
Prevention and destruction of weeds on the permanent way Wensley F AM 1950-1
Cooperation, engineering and signal departments Dyke A W M VP 1950-1
Maintenance of running lines and sidings, systematic working on GNR Ireland McCann J M 1950-1
Lighting of stations, depots and yards Hunt R W AF 1950-1
Preassembled track relaying in Standedge, Bowling and Morley Tunnels Chaplin C J F 1950-2
Concrete in railway engineering Isaac P C G AF 1950-2
Formation, drainage and track maintenance in the London area Dunton C E F 1950-2
The marking of permanent way lengths Best W H F 1950-2
Collaboration between engineering and operating departments Forester Fielding A F 1950-2
The training of young permanent way men Waters J AM 1950-2
Maintenance and care of the Severn Tunnel Weston W H M 1950-3
The development of underground transport Reid A  -  1950-3
Restoration of the up line after collapse of part of Shepton Mallet Viaduct George G F AF 1950-3
Sleepers  Robinson N S AF 1950-3
Discharging/relaying 60 ft BH rail and prestressed concrete sleepers by hand Wilson J M 1950-3
The spotter (Hallade track recording) Banks J AM 1950-3
A review of the railways under nationalisation Train J C L F P 1951-1
The Netherlands, characteristics, railways, and big civil engineering works Van Bilderbeek B  -  1951-1
Maintaining long welded rails Horan M AM 1951-1
Works control Ormiston H AF 1951-1
Civil engineering works on the Netherlands Railways after the war Cuperus J L A F 1951-2
Stengthening of track bed on Hague to Utrecht main line anon  -  1951-2
FB rail fastenings, Netherlands Railways Mundt T W  -  1951-2
Lineside drainage Paterson A AF 1951-3
Compressed air Ford W J F 1951-3
1900 - 1950 railway development and progress/events in the North-East Bygott W M 1951-3
Can we mechanise maintenance? Best W H  F 1951-3
A course of instruction at the School of Transport, Derby O'Keefe W M 1951-3
Forty years as Corresponding & General Secretary, PWI Janes H Sec 1952-1
Renewal of Wiske Moor water troughs Eagers H F 1952-1
Track circuiting and the Civil Engineering department Piper G W  - 1952-1
The partial relining of Clifton Down Tunnel Boon P C AM 1952-1
Permanent way tools Wogan H M 1952-1
Visit to Swedish State Railways, July 1950 Lea J A AM 1952-1
Flat Bottom v Bull Head track Bennett L J / Duddridge L F  - / - 1952-1
Accidents attributed to permanent way faults, and the lessons to be derived Scott A P AF 1952-1
Track circuit maintenance and installation by permanent way and S and T departments Burton I AM 1952-2
The American Railway Engineering Association (AREA) Sherrington C E R F 1952-2
The effect of time on railway maintenance Fletcher B P F 1952-2
Building a railway line Best W H F 1952-2
Maintenance and renewals of track in tropical Africa Humberstone F M 1952-2
Cooperation between transportation and engineering departments (Rhodesia) Croxton A H  - 1952-2
Realignment of curves Smith R G AF 1952-2
Thermit welding Humphreys A E  M 1952-2
Some interesting aspects of a railway career Train J C L F PP 1952-3
Relaying in single line tunnels Cliffe W M 1952-3
Improvements with permanent way during 25 years on the Malayan Railway Fenwick J L F VP 1952-3
Contributions of research in modern rail design Loach J C AF 1952-3
Technical diamonds Cooil W D AF 1952-3
Some Estate Department activities affecting the permanent way Mitchell J R D  - 1952-3
The South-East connection (Rhodesia) Green L R F 1952-3
Surface water and clay Smith M G R F P 1953-1
The purpose and working of self-acting inclines Young W AM 1953-1
The Avon Gorge, and the construction of the Clifton Suspension Bridge (1753-1864) Wensley F AM 1953-1
Reconstruction of French Railways (SNCF) Miot M  - 1953-1
Deterioration of formation and remedial measures Swinnerton N W F 1953-1
Relaying, the work behind the scenes Walker R H AF 1953-1
The new permanent way man Flewers J W AM 1953-1
The manufacture of switches/crossings/layouts and engineering at Angerstein (SR) Goatley F H M 1953-1
Mechanisation of permanent way work, where is it leading? Dean A F 1953-2
Construction of the Kongwa Branch Line, Tanganyika Railways Harmer A F C AF 1953-2
Track maintenance and renewal on French Railways Aspinall G AF 1953-2
The duties of a timekeeper Farquharson J AM 1953-2
Accidents and derailments Clarke H W M 1953-2
Visit to Belgian Railways Balls R G AM 1953-2
Architecture and the railways Cavanagh H E B  - 1953-2
The use of rubber rail pads on the permanent way Sonneville R  - 1953-2
Modern methods of track blanketing Campbell I M AF 1953-3
Rules for the prevention of accidents to new members of the permanent way staff Banks J AM 1953-3
Relaying of fittings at Bristol West Temple Meads station, Dec 1951 Hawkins G M 1953-3
Derailments and their effects on permanent way and staff Murphy P J M 1953-3
Results of thermit welding Humphreys A E  M 1953-3
Concrete in railway construction Russell P  - 1953-3
109 lb FB plain line relaying by hand Fricker W P M 1953-3
Table Bay harbour, South Africa Carlisle J F F 1953-3
Civil engineering on London Transport Dunton C E F 1954-1
Some aspects of railway track Barnes P  - 1954-1
My early railway service and membership of the PWI since 1922 Wensley F AM 1954-1
Signalling and telecommunications, Sudan Railways Godfrey L J  - 1954-1
Memories of Northern Rhodesia in the 1920s Knaggs F T F 1954-1
The improvement of a junction during relaying James P AF 1954-1
A few thoughts about permanent way stocks Walker R H AF 1954-1
Prestressed concrete Horsfield H T AF 1954-1
Cropping and drilling of rails in track, Jalgaon and Nagardevla, Central Rly, India Gupta S L / Anver V F / - 1954-2
Maintenance of the Bulawayo Depot yard Hanson M C AM 1954-2
Concrete sleepers Swinnerton N W F 1954-2
Carrying weight over space - some notes on the bridge Best W H  F 1954-2
London Transport track problems on bridgework and waybeam renewals Trissler H C AF 1954-2
Rail extensions 1952-4, Sudan Greenhouse W J AF 1954-2
That tamping gives better track than measured packing anon  - 1954-2
Engineering department occupations from Operating Department viewpoint Penney G  - 1954-2
Tunnelling on Bundi - Barkhera construction Singh S J M 1954-3
Prestressed concrete beams made at Port Sudan El Moula M E M F AF 1954-3
Machines and the permanent way Best W H F 1954-3
The platelaying train on the South East Connection, Rhodesia Railways Hawkins A M F 1954-3
Railway maintenance over fenland Bonny R F F 1954-3
Automatic train control in Great Britain Currey J H  - 1954-3
Railway civil engineering, the present and the future Smith M G R F P 1955-1
The corrosion of steel sleepers and protective measures for structural steel Hudson J C   - 1955-1
Lifting bridges in the Suakin Line, Sudan Jackson J G AF 1955-1
Mechanisation and education on the permanent way Flewers J W AM 1955-1
Relaying of secondhand thermit welded track Looney A M 1955-1
Railway news and views Cooke B W C  - 1955-1
The Forth Bridge Bell G  - 1955-1
A civil engineer's expenditure budget, its preparation and use Dean A F P 1955-2
Our legal rule book, the Railway Clauses Consolidation Act 1845 Belton F B  - 1955-2
New Cumnock water troughs Picken J H AF 1955-2
Thermit welding on Irish Railways Carson T A F 1955-2
A rail stress investigation in Rhodesia O'Mahoney B M E F 1955-2
Tunnelling work with precast reinforced concrete segment lining Barbey M F F 1955-2
Permanent way "Mechanical Muscles" in use on British Railways Mosedale R C AF 1955-3
Experiments with track rollers for slewing permanent way Newson-Smith L H AF 1955-3
Singa - Roseiris Railway extension, Sudan, 1953/4 Sukkar Y M F 1955-3
Flat bottom track components Heeler C L AF 1955-3
The first tunnel on the Rhodesia Railways Johnson H R F 1955-3
Experimental long welded rails in tunnels on the Northampton District Labrum E AF 1955-3
A few thoughts on money in relation to the engineer's department Walker R H AF 1955-3
Accidents that happen to permanent way men Banks J AM 1955-3
Designing permanent way for the first time in 1956 Dean A F P 1956-1
Rhodesia, its ways and railways Thompson C K F 1956-1
Gauging of structures, clearances, and out-of-gauge/exceptional loads Dunkley C V F 1956-1
Modern railway motive power Matthewson-Dick T  - 1956-1
The post-war North Borneo Railways Wikner A R F 1956-1
Bridge maintenance affecting the track Pearson H M AF 1956-1
Recent developments in permanent way design Rock L G B F 1956-2
Folkestone Warren landslips anon  - 1956-2
The work of a length ganger Dobson J AM 1956-2
Concrete sleepers (India) Antia S K F F 1956-2
Prefabricated plain line renewals Eagers H F 1956-2
Railway modernisation Dunbar A R  - 1956-2
Derailments   O'Keefe J M 1956-2
A diesel mechanical shunting locomotive with automatic gearbox anon  - 1956-2
Paint, past and present Todd A W AF 1956-3
The production of rails Rees A  - 1956-3
New earthworks from the maintenance platelayer's point of view Hughes P H F 1956-3
The importance of supervisory staff in maintenance of track (SNCF) Levi R  - 1956-3
Finding rail defects by modern methods Banks J AM 1956-3
Visit to Germany by permanent way evening class (1955/6) students Turner T D AF 1956-3
Hard labour saving developments affecting permanent way work Dean A F P 1957-1
Civil engineering work for electrification of Liverpool St - Shenfield, E Region , BR Dallmeyer J R F 1957-1
The River Thames and London Docks Fisher J A F 1957-1
Crewkerne, long welded rails on concrete sleepers Lake J AF 1957-1
Permanent way ballast, its use and purpose Smithies R W  AF 1957-2
A story of permanent way Simons E N / Carr D P F / F 1957-2
The ballast drag MacLeod N J AF 1957-2
Work study Bailey R W F 1957-2
Official visit to Germany, June 1957 Clarke H W VP 1957-3
Railway civil engineering in the USA Mottershead G AF 1957-3
The construction of the Severn Tunnel Walden J G AF 1957-3
Locomotive loading and train timing (Sudan) Hummeida S A E A F 1957-3
Track/vehicle reaction and the running of  Track Testing Car no.139 Hancock R M  - 1957-3
The effect of new motive power on the permanent way - the mechanical engineer's view Cox E S  - 1957-3
Long welded rails Alley G D S F 1958-1
Urban railways and technical developments in Germany, Russia and Sweden Dunton C E F 1958-1
Illness and accidents MacKenzie R F  - 1958-1
More about testing rails for defects Banks J AM 1958-1
My visit as a sub-ganger to the German Federal Railways Easterbrook A AM 1958-2
Trends in the duties of Permanent Way Inspectors Edrich A C / Savill A F / M 1958-2
Ballast and formation renewal Barbey M F F 1958-2
Timberwork in deep excavations and tunnelling Harbottle M F 1958-2
Production of sleepers at the West Hartlepool creosote depot Martin W AF 1958-3
Long welded rails        White I G/Fawcett F/others AF / F 1958-3
Level crossings Chaplin G AF 1958-3
High speed junctions and crossovers White W A C F 1958-3
National Insurance Industrial Injuries Act 1946 Hulme S F 1958-3
Reconstruction of Temple Mills Marshalling Yard Newens E R F 1959-1
Some problems of bridge maintenance Rigby J L F 1959-1
This costs money Dobson J M 1959-1
Paying for the railways anon  - 1959-1
The permanent way engineer in relation to his colleagues Dunton C E F P 1959-2
The maintenance of long welded rails Coombs D H F 1959-2
The Matisa Track Recording Trolley Field H E M 1959-2
Impressions of British Railways and experience and training in the UK Sampanther TT AF 1959-2
The PWI and the technical training of the permanent way worker Clarke H W M VP 1959-2
Where do we go from here? Brinsmead K F 1959-2
Maintenance of a port area and the permanent way inspector's duty (Malaya) Packirisamy S M 1959-3
Development of motive power on East African Railways and Harbours Administration Bulman W E  - 1959-3
Drainage, track stabilisation, cuttings and embankments on the German Federal Rly Bethauser A  - 1959-3
Belgium and the Belgian Railways Jacops A  - 1960-1
Retrospect Young W AM VP 1960-1
Long welded track in the Netherlands Deenik J F  - 1960-1
Railway Modernisation Plan Webber C F P AF 1960-1
Memories of the M & G N Bonny R F F 1960-1
Platelayers' tools and the dangers in their use Clarke H W M 1960-2
The work intensity and rationalisation of track maintenance operations (Japan) Hida M  - 1960-2
Nigerian tour 1955/6 Flewers J W D AM 1960-2
Signalling for modernisation Green R A  - 1960-2
Five years of ultrasonic testing on the Southern Region Banks J AM 1960-2
Some experiences of an Area Assistant District Engineer Batley J G AF 1960-2
Permanent way section manning and its relation to track standards Hissey W A  AF 1960-3
Track recording coaches Alley G D S F 1960-3
Mechanised track relaying on the Victorian Railways (Australia) Reynolds L A F 1960-3
The shopkeeper Russell T H D F 1960-3
Two years, the Institution and London Transport Dunton C E F P 1961-1
Modern railway signalling Cunliffe J P F 1961-1
Preservation of wood Rothwell W AF 1961-1
Productivity, morale, and incentive bonus schemes Cameron J C F  - 1961-1
Permanent way, its recent history and future prospect Terris A K F P 1961-2
Long rails and modern thermit welding Ahlert W F 1961-2
Long welded rails, handling and maintenance on London Transport Trissler H C AF 1961-2
The design, testing and selection of rail sections Babb A S  - 1961-2
Plant & Machinery Exhibition, Elst, Holland Thornewell W T M 1961-2
A history of British Railway track Cliffe W AM 1961-3
Future permanent way practice Coombs D H F 1961-3
The problems of trespass Thomas F H   - 1961-3
Eastern Region modernisation Rosindell P W  AF 1961-3
Permanent way postscripts and supplements Terris A K F P 1962-1
Reconstruction works at Farringdon Glover E F AF 1962-1
Practical aspects of earthwork Muir J / Dring G AM / AM 1962-1
The planning and control of permanent way maintenance Myers G AF 1962-1
West Riding railways - past, present and future Ormiston H F 1962-1
Track problems on the Southern Region of BR Cantrell A H F P 1962-2
Inspection of materials Ford F K  - 1962-2
Progress in the non-destructive methods of detecting rail flaws Banks J AM 1962-2
The backgroung of bridging Jenkins A H F 1962-2
Reminiscences Hughes G HLAM 1962-2
The construction of the Shire Highlands Railway, Rhodesia, 1903 - 1908 Stevens H W F 1962-3
Forty years on the permanent way in Southern Ireland Plumer A M F 1962-3
Switch heating MacLeod N J AF 1962-3
Railway accidents Labrum E F 1962-3
Essential features of the thermit metallurgy Ahlert W F 1962-3
Civil engineering visit to Canada and USA March 1961 McMurdo A W F 1963-1
Features of maintenance and renewal on London Transport Chanter H F 1963-1
Civil engineering maintenance on the German Federal Railways (DB) Henwood A B F 1963-1
The why and wherefore of stocktaking McMahon P F AF 1963-1
Payment by results, a permanent way inspector's viewpoint Stafford G R M 1963-1
Lifting appliances, our problems Hastie B J M 1963-2
The job card system of track maintenance Emerson A I F 1963-2
Recent developments in railway weed control Jenkins R C F 1963-2
Fifty years of railway service Brockbank W J M 1963-2
A permanent way exhibit at Longmoor Moorhouse Maj W  - 1963-2
Rail welding and experience with CWR and switches on the German Federal Rly (DB) Birmann Prof F  - 1963-3
The use of rubber and plastics in fastenings Eccles R G AF 1963-3
Forty years alliance between the District Engineer and the Motive Power Department Blundell J F 1963-3
Accidents on the permanent way and their prevention Hulme S F 1963-3
The permanent way ahead Butland A N F P 1964-1
The application of electronics to railway operation Ogilvy H H  - 1964-1
Construction of the Mnyusi - Ruvu Line, East African Railways and Harbours Rahmani K AF 1964-1
Bridges as they affect the permanent way man Bridge E K  - 1964-1
Old and new facts about the Severn Tunnel Pocock R T M 1964-1
The Articles of Association (PWI) anon  - 1964-2
Mining subsidence Wallace A U F 1964-2
Yard relaying Redmond D M 1964-2
Forty seven years experience in the engineering department of BR Rushbrooke E L AF 1964-2
Electrification Payne P G AF 1964-2
Aspects of painting McMonagle G D AM 1964-2
North Wales sea coast defence works Price J VP 1964-3
Dublin tramways Butler A R AF 1964-3
The history and development of the insulated rail joint Douglas R I F 1964-3
Mechanised platelaying on the Chiredzi Branch, Rhodesia Carlisle J F 1964-3
Planned mechanised maintenance for high speed lines Edwards C W / Styles N H AF / AF 1965-1
Work study Jewell D G AF 1965-1
The outside activities of the Soil Mechanics section Broome E A M 1965-1
The future of railways Allen Cecil J F 1965-1
The Channel Tunnel Gibb D  - 1965-1
Where did the expansion gap go? Gilmore I H AF 1965-2
Basic track mechanics Dearnley H AF 1965-2
Resource planning Wood W M / Phillips N AF / AF 1965-2
Production and supply of stone ballast McCallum J M AF 1965-2
The challenge of change (USA) Devine G S  - 1965-2
The controlled application of explosives in demolitions Swinnerton H A  - 1965-3
Metallurgical aspects of rail manufacture at Workington Morgan E  - 1965-3
Railway construction in the 1860s Bender P J AF 1965-3
The new railway Ibbotson L W  - 1965-3
The Delta Plan (Netherlands) Swier G  - 1965-3
The Sperry method of detecting rail defects on American railroads Banks J AF 1965-3
The dieselisation of the Central Division Weeden G A F 1966-1
The work of the Inspectorate and safety on the railway Robertson Col J R H  - 1966-1
Chiredzi Branch Line construction, Rhodesia Keefe A G AF 1966-1
Accident prevention Lodge G F 1966-1
The maintenance of permanent way in colliery subsidence areas Clafton D W M 1966-1
Lines to prosperity Barnwell F R L F P 1966-2
A history of railways in Ireland Plumer A M F 1966-2
Training at the Permanent Way School Poona, and visiting Indian Railway centres Kee L J F 1966-2
Planning and control of track renewals on the Eastern Region Robinson H H F 1966-2
Railway architecture Fagg A J  - 1966-2
The railway platelayer Hurley J M 1966-2
Level crossings McClelland E F 1966-3
The Retford diveunder O'Loughlin T B / Battle K E F / - 1966-3
The supervisor and his work Evans F M 1966-3
Wheel-burnt rails, the cause and means of detection Banks J AF 1966-3
Forth Road Bridge Simpson A G  - 1967-1
The Festiniog Railway Elvy M R AF 1967-1
On Line, Malawi Railways Fox C AF 1967-1
Permanent way on the Victoria tube Chanter H F 1967-1
Some notes on railway gauges Hodgson P AF 1967-1
Flood damage/remedial measures, track & bridges, Dublin - Wexford Line, 1965/6 Yates T C F 1967-2
Fishguard Harbour - past, present and future Samuels P AF 1967-2
The economics of planned permanent way maintenance (Netherlands) Hauer J M   - 1967-2
Modern permanent way training Paterson A F 1967-2
The modern weed killing train Oldham L F 1967-2
Automatic trains, London Transport Wager E W  - 1967-3
Mechanised maintenance on the Scottish Region of BR Currie D S F 1967-3
Railway training and education Gibson J D  - 1967-3
Flat bottom track, redesign of switches and crossings Heeler C L F 1967-3
Some uses and applications of modern jacks Hannay-Wilson H R F 1967-3
Railway developments at the port of Harwich Genzel D G AF 1967-3
Mobile gang planning under mechanised track maintenance Hewson C F AF 1967-3
Safety on the track Field C M F 1967-3
Research in retrospect Loach J C LF 1967-3
Further track developments Paterson A F P 1968-1
Railway architecture and landscape Abbott R D  - 1968-1
Civil engineering applications of pulverised fuel ash Smith P H   - 1968-1
The Mainz region of the German Federal Railway (DB) Wittig W  - 1968-1
Sea defences on the East Coast Pearson D C F 1968-1
Derailing tendencies in rolling stock, traction units and track Dearnley H AF 1968-1
Visit to Japan 1965 Sykes W J A  - 1968-1
Current transport policy in the Rhineland Altmeier Dr P  - 1968-2
Rediscovering the role of railways in Great Britain Dean A F PP 1968-2
Railways compared with other means of transport Den Hollander Dr F Q HF 1968-2
High speed track Emerson A I F 1968-2
Switches and crossings, new vertical design - design Heeler C L F 1968-2
Switches and crossings, new vertical design - manufacture Adams D V F 1968-2
Switches and crossings, new vertical design - installation Skull J F 1968-2
North Sea oil and gas Smith Dr J E  - 1968-2
The development of permanent way Wheaton G F AF 1968-3
Continuous welded rail Ratcliffe C W AF 1968-3
Remote control and train describers Rose J R AF 1968-3
Safety at work Wade N AF 1968-3
The supervisor and mechanised maintenance of the permanent way Webb W T M 1968-3
Parkeston Quay and Stratford International Freight Terminal McMurdo A W F 1969-1
The railways and our contribution to their future Paterson A F P 1969-1
One aspect of switch and crossing maintenance Smith J AF 1969-1
Permanent way research Sparrow Dr R W F 1969-1
Severn Bridge Sharpness, disaster and demolition Barnwell F R L F PP 1969-2
London - Bournemouth electrification, Southern Region Mann G F 1969-2
An introduction to vertical switches and crossings Curry R AF 1969-2
Test House for diesel and electric locomotives at Doncaster Works Pink R N F 1969-2
Testing and knowledge required by ultrasonic rail testing operators Banks J AF 1969-2
Penrith bypass bridges Chorley R M AF 1969-3
The safety role of the supervisor Lodge G F 1969-3
Keeping the wheels turning Griffiths R AF 1969-3
New methods of maintenance Shepherd G M 1969-3
Railways and their public image Dow G  - 1969-3
Milestones - permanent way progress 1928 - 1968 Letman A E M 1969-3
Introduction of mechanised maintenance Simpson F AM 1969-3
Track and traffic Beattty W F F P 1970-1
An inspector's thoughts on mechanised maintenance Bridgestock J M 1970-1
The development of hydraulic tensioning equipment for CWR track MacLeod N J F 1970-1
Staff and supervisory training Long C J F 1970-1
Repairs to gantry crane tracks at Cardiff Canton Diesel Depot Jones T H M 1970-1
The Swaziland Railway Hawkins L A W  - 1970-1
The new Tokaido Line, Japanese National Railways Campbell I M  - 1970-2
Training of trackmen Tomnay F F 1970-2
Reflections in retrospect Johnson A J AF 1970-2
Channel Tunnel - planning and operation Manson J B F 1970-2
Plassermatics - design, operation and maintenance Hughes T G M 1970-2
Narrow gauge railways Barbey M F F 1970-2
Central material depots Brown G M M 1970-3
The work of a safety officer Lodge G F 1970-3
Switch and crossing work and metrication Barber J E AF 1970-3
Organisation and execution of permanent way work Law G / Sisson W F / M 1970-3
Calor gas, butane and propane Brown P G  - 1970-3
Taking up possessions Graham W T  - 1970-3
Overhead line electrification in relation to civil engineering Proctor F S / Lyon E C F / - 1971-1
The evolution of the railway ganger Houlbrook T H M 1971-1
Training and the track Blower A F 1971-1
Development of mechanical track laying equipment Boyer J J / Allenby R J  - / - 1971-1
The transport scene in the 1970s Newens E R F 1971-1
Running on rails Miller T C B F 1971-1
London Bridge (the bridge) Brown C D  - 1971-2
Adhesives in works maintenance Walton J A F 1971-2
Forty happy years attending PWI conventions and conversaziones Reid A J HLM 1971-2
Fire precaution Devlin A L M 1971-3
Permanent way maintenance, past and present Letman A E M 1971-3
The work of the Scientific Services Division of the Research Department Hall M T F 1971-3
Engineering possessions and the fare paying passenger Jackson T J  - 1971-3
Bristol Multiple Aspect Signalling System Harris D J F 1971-3
The Nacala Rail Link, Malawi Clarke C W  - 1971-3
Track lighting and small plant Bird R C M 1971-3
Rail standardisation in South Australia Domleo I S F 1972-1
The permanent way supervisor and his section Stevens E E M 1972-1
Concrete level crossings White P F 1972-1
Training from an inspector's point of view Nisbet J M 1972-1
Switzerland and the Swiss railways Betlem H P B  - 1972-1
Development of high speed on the ECML McMurdo A W F P 1972-2
High speed curve realignment on the London Midland Region Shepherd G J AF 1972-2
Track safety features and development of the Alexander Early Warning System Thomas F H/Field C M/Alexander G C L/D R R F / F / F / F 1972-2
The research and development programme for the Advanced Passenger Train Newman M  - 1972-3
Forward thoughts on permanent way McMurdo A W F P 1972-3
Newcastle East End Diamonds Elliston P W / Williamson S AF / M 1972-3
Experiences on American railroads Thornewell W T M 1972-3
The Channel Tunnel and its effect on rail traffic in Western Europe Bussell Ms H L  - 1972-3
Problems of track maintenance for high speed Rees P F 1972-3
Preparation for automatic ballast cleaning and plain line relaying Sysum F P M 1972-3
Sheffield - city on the move Wigley P  - 1972-3
Ton up and beyond Evans R E F 1973-1
Magnetic inspection and the dye penetrant method for rail defects Banks J AF 1973-1
The role of Area Manager Taylor R K F 1973-1
Mechanised maintenance machine development Pearson D C / Fawcett B C F / M 1973-1
The Cape Gauge Railway network of the Great African Peninsular Clarke C W F 1973-2
Modernisation Seymour B  - 1973-2
The S S Great Britain Blake Cmdr J A  - 1973-2
Maintenance difficulties - Civil and S & T engineering departments Forbes A M 1973-3
Varied systems for permanent way maintenance Wilson E M 1973-3
Problems with masonry bridges, and some solutions Ellis I W   - 1973-3
On track signalling problems relative to modern permanent way practice Whitehouse W H  - 1973-3
A history of public transport in Glasgow Browning A S E  - 1973-3
Modern track renewals Pitkin K J VP 1973-3
Civil engineering for the railways of today, tomorrow, and the day after Ormiston H F P 1974-1
The role of the government in railway safety, and the work of the Railway Inspectorate McNaughton Lt Col I K A  - 1974-1
Outside looking in Harbottle M F 1974-1
WCML electrification, Scottish Region civil engineering work Dorward J M AF 1974-1
So you want to be a permanent way inspector? Cowper T / Russell J / Slaver C  - / - / M 1974-1
Towards higher speeds Campbell I M  - 1974-2
Systematic track maintenance Vine J P AF 1974-2
Staff clerks, the abominable no-men Flynn G J F 1974-2
Maintenance aspects on LTE Woods J A / Cole G AF / - 1974-3
Permanent way experience of Heavy Duty Ore Railway in North West Australia Carlewis Col W P  - 1974-3
Civil engineering aspects of the electrification  between Preston and Carlisle (WCML) Chorley R M AF 1974-3
Span replacement of 26 ft Whitton type ballast top timber openings Mitchell R F 1974-3
Permanent way problems of South African Railways, and probable solutions Paterson H O  - 1974-3
Engineering research on British Railways Sparrow Dr R W F 1975-1
The work of a resident engineer Bender P J AF 1975-1
Accident prevention McCulloch J F 1975-1
Planning of possessions Proud J G / Dodds G T F / - 1975-1
Railways of South Africa, track problems and solutions Pitkin K J F 1975-2
The role of pulse-echo ultrasonic testing in modern railway civil engineering Farley P G   - 1975-2
The Robel 24.21 Trackliner Joyce D W AF 1975-2
Safety at work Wilkinson S  - 1975-2
We move mountains Chitty H C AM 1975-2
Railway architecture Millin N C  - 1975-2
The Permanent Way Institution, past and present Turner J A R F Sec 1975-2
Track research work at the Railway Technical Centre Frederick C O F 1975-3
Mechanical relaying leading to the Secmafer M.9 Allenby R AF 1975-3
London Transport tunnel cleaning train Faulkner F J S F 1975-3
The British Transport police Colbourne V C  - 1975-3
Modern permanent way developments Purbrick M C F P 1976-1
Training of permanent way staff in Eastern Region of British Railways Muir J H  M 1976-1
Problems arising with on-track machines Swift F M 1976-1
Civil engineering on the Southern Manson J B F   1976-2
Examination of surface cracks in rails by the eddy current technique Banks J / Hansford D C AF / - 1976-2
Chemical control of brushwood Castell J A F 1976-2
Mechanisation of track maintenance on the Cane Railways of Queensland Shaw E W F 1976-2
Availability of men and machines Kolarovszky M F 1976-2
Great Western permanent way Mann J W AF   1976-3
High speed track recording coach Lewis R B  -  1976-3
Building and installing switches and crossings Ingleby C M 1976-3
Duties of an Area Civil Engineer on the East Coast Main Line Hill W AF 1976-3
Some reflections on being a permanent way supervisor Timney E M 1976-3
Rutenga to Beitbridge construction, Rhodesia Pitkin K J F 1976-3
Stone production and transport Coster P J F 1977-1
Underground rail installations at Mount Isa Mines Ltd., Queensland MacHunter P M F 1977-1
New systems for urban transport Underhill C W F 1977-1
Borough Market Junction Morgan J C  AF 1977-1
Track for High Speed Trains Ormiston H F 1977-1
Construction of the underground railways in Liverpool Evans H W F 1977-2
The on-track machine - its working and problems Carlin E M 1977-2
A walk along the Stockton and Darlington Railway Flynn G J F 1977-2
Glasgow Underground - an outsider's view Carson P J AM 1977-2
Track welding - a supervisor's experience in the Eastern Region of British Railways Reed G D M 1977-3
Railway construction in Jordan Garden R L F 1977-3
Alumino Thermic welding of rails Lugg P J C AF 1977-3
Lifting tackle and hauling equipment  Hastie B J M 1977-3
Mechanisation of permanent way work - past, present and future Currie D S F P 1978-1
Training at present and in the future Rogers A W F 1978-1
Transport in an era of scarce resources Underhill C W F 1978-1
Aspects of track maintenance and renewal on the Belgian Railways Gunst Ir G  - 1978-1
Great Northern suburban electrification and associated projects Davis P B / O'Laughlin T B F / F 1978-2
The Gatwick project Coster P J F 1978-2
Level crossings, past, present and future Craig T W  - 1978-2
Some methods of increasing line capacity of single lines O'Mahoney B M E F 1978-2
Netherlands Railways' approach to permanent way matters Bonham-Carter R F F 1978-3
Reconstruction of Glenury Viaduct Hill-Smith D / Dobbie D C M AF / - 1978-3
Divisional problems - waybeams and level crossings Barnard A / Ellis D / Holley C AF / M / AF 1978-3
Person in charge of possession - PICOP Ham R E  AF 1978-3
Goole Swing Bridge - collision damage and subsequent repair Kealey D N F 1979-1
Transport in Canada Currie D S F P 1979-1
Saldanha to Sishen in 18 months Faulk A J AF 1979-1
Railways Western and westward Rees P F 1979-2
Preparing and maintaining track for 125 mph Skeldon P J / Hunt P J F / AF 1979-2
Leeds Neville Hill HST Depot as designed and built Wheeler C J / Rennolf M F / AF 1979-2
Transporting rails in CWR curved track Douglas D P AM 1979-2
Planning on Rhodesia Railways O'Mahoney B M E F 1979-2
Aspects of relaying in Wooley and Huddersfield Tunnels Collins M / Thornton D J AF / AF 1979-3
Planned preventive maintenance of railway equipment Brew J R F 1979-3
Fire prevention in the Eastern Region of BR Smith S M 1979-3
Problems of a permanent way supervisor White A / Smith K AF / M   1979-3
The engineer has possession of the line Woods J A F 1979-3
York: a centre of transport Goode P O H F 1979-3
Kango Ralfe C G F 1979-3
Railway developments in the Far East Cuthbert E W F P 1980-1
Highland Line, increased capacity engineering work Urquhart J D AF 1980-1
Living with your neighbour Collier A J F 1980-1
Major track rehabilitation on a small scale Tasker D R F 1980-1
Some aspects of management practice and style Derwent S C  - 1980-1
Irish Railways in the contemporary scene Higgins J F  - 1980-2
How do I repair this ? - unusual bridge repairs Towse B C / Nash F F / - 1980-2
Planning aspects of Bapsfontein Marshalling Yard Walss J  - 1980-2
Railway through the Alps - Bern-Loetschberg-Simplon Railway Blower A F 1980-3
Works supervisor's part in station improvements McMonagle G M 1980-3
Repair works in the Leeds division Sales P M 1980-3
Explosive hardening of austenitic manganese steel crossings McBurnie J / Guild J C / Wilson J C B  - / - / - 1980-3
Rails to Blaenau Ffestiniog Bucknall R P AF 1980-3
What is happening on the KCR ? Elvy M R  -  1980-3
Railways of Australia vehicle/track studies Holme A B / others F / - 1980-3
Recent trends in manufacture and use of main line rails at Iscor de Vos J P  - 1980-3
Channel Tunnel, past, present and prospects Lamming R A E F 1981-1
Charing Cross River Bridge, renewal of deck, east side and middle road Beckwith R C F 1981-1
Brief history of National Railroad Passenger Corporation (Amtrak) McDaid C R F 1981-1
Developments in relaying on the Redhill area of the Southern Region Joyce D J AF 1981-2
A bridgeman's view of the permanent way Bonnett C F F 1981-2
Flashbutt welding of rails Faulkner F J S F 1981-2
North-west study tour of the Western Australia section July 1980 Marks R M AF 1981-2
Development of a flashbutt welding depot Abbott M J F 1981-2
Development of a track information system for Hamersley Iron Dwyer P  - 1981-2
West Riding journey - some permanent way lollipops Mallon J M 1981-2
Man at the throttle - adapted from "Main Line of mid-America" Corliss C V  - 1981-2
To Lancaster via the West Coast Main Line Coon R J F 1981-3
Mining subsidence and  transducer monitoring of CWR Armstrong W T F 1981-3
Paved concrete track - PACT Craig G B F P 1982-1
Concrete railway sleepers at Isa Mine MacHunter P M F 1982-1
Conversion of the North Tyne Loop Line Kirkland P M 1982-1
History and development of maintenance of way 1940 - 1980 Yates T C F 1982-1
New carriage, locomotive and dmu depot at Crown Point, Norwich Lewis W M F 1982-2
Value for money - an accountant with a shovel Wood T A AF 1982-2
Mangaweka - Utika Railway deviation N Z Railways  - 1982-2
Underwater inspection of structures Maddison B R AF 1982-3
Selby Coalfield diversion of the East Coast Main Line Payne P G F 1982-3
Bramhope Tunnel - bulge repairs 1980/1 Holmes G C F 1982-3
Visit of the London Section to the USA Phillips Q F 1982-3
French railway track Alias J F 1982-3
Cutting of rail by oxy-acetylene to remove buckled or excess rail Iskra J M 1982-3
Microprocessor controlled trackside recorder Manning J R F 1982-3
Pursuit of excellence Rees P F 1983-1
Rails still bind the world together Hughes R V F 1983-1
Serpell Report Press comment  -  1983-1
Permanent way - a review Currie D S F 1983-2
Adelaide - Crystal Brook standard gauge railway project Adams J C B F 1983-2
Switch on - switch off Baskerville J M 1983-2
Precast concrete sleepers on British Rail Cope G H F 1983-3
Systematic approach to management of track at Mount Newman Mining Railroad Downs L H F 1983-3
Considerations prior to a contractural commitment to rail grinding Scroba P AF 1983-3
Pilbara rail link alternatives Alexander H M F 1983-3
History and operation of Wagon-Lits Carson D J AF 1983-3
Caught in the act of health and safety at work Binks M B AF 1983-3
Permanent Way Institution - a historical review Turner J A R F 1984-1
Permanent way engineering review - foreword Purbrick M C  F 1984-1
Developments in the construction of conventional track Frederick C O F 1984-1
Non-conventional track support Whitbread J E F 1984-1
Modern S & C design Cope G H / Dawkins A W F / AF 1984-1
Track maintenance Goldie J R F 1984-1
Lining and levelling techniques Hunt P J F 1984-1
Civil engineering mechanical plant Baines G E F 1984-1
Measurement of track quality Lewis R B  - 1984-1
One hundred years of the engineering department Mann J W F 1984-2
A major breakthrough in urban mass transit Emmanuel J D  - 1984-2
The great wash out Chorley R M F 1984-2
Permanent way man's task - today and tomorrow Coon R J F P 1984-3
Development of London's railways north of the Thames 1884 - 1984 Jackson A A  - 1984-3
Tyne and Wear Metro, the final stage ? Watsin I T AF 1985-1
Some aspects of my railway career McIntyre H E F 1985-1
Lubrication of the permanent way Flint D F 1985-1
Track undercutting Domleo I F 1985-1
Planning of loose sleeper relaying Law R F 1985-2
Eastern Region long welded rail loading train Cooper J / Adamson G AF / AF 1985-2
Development of loose sleeper/bale relaying on the Southern Region Allen-Ross D AF 1985-2
Railways of Sri Lanka Bernard B F 1985-2
Britannia Tubular Bridge fire Hitchinson F W   - 1985-2
Austrian Railways Lovesay P AM 1985-2
Sentrarand Marshalling Yard and link lines - operating and maintenance Annandale G  - 1985-2
Patchway Tunnels, renewal of drain under the four foot way Percival K S  AF 1985-2
Repairs to Summit Tunnel on the Up-Country Line, Sri Lankan Government Railway de Silva P F 1985-3
Diary of a chief supervisor Martin J / Hand F M / M 1985-3
Mooliabeenie - Dongara rail recycling problems and solutions Iskra J M 1985-3
Switches and crossings on concrete bearers Morgan J C F 1985-3
The permanent way business Proctor F S F P 1986-1
London's railways 1884 - 1984, the Underground Bonnett C F F 1986-1
Historic civil engineering works Cragg R  - 1986-1
Traen 150 - Irish Railways today Carson D J AF 1986-1
Kowloon - Canton Railway Elvy M R F 1986-1
North East Area - maintaining the rural railway Chorley R M / McLeod D F / - 1986-2
Tay Bridge - history and maintenance Hill-Smith D / Joliffe P F / - 1986-2
New track forms Potts W J AF 1986-2
Victoria Falls Bridge Bridgeford A F 1986-2
Under Paris by rail Carson D J AF 1986-2
Track relaying on the Coast main line at Tursdale Junction using PUM gantries Thomas l M 1986-3
Railways south of the Thames Davies W D  - 1986-3
Railwyas in Hong Kong and China Manson J B F 1986-3
The Royal Road - 150 years of enterprise Rees P  F 1986-3
Steel sleepers - state of the art Man F F 1986-3
Towards 125 on the Southern Evans P J F 1987-1
Forth Bridge - history, construction and maintenance Grant W D F / Dargue L B F / F 1987-1
Patrolling the track Heyd-Smith R AM 1987-1
Monitoring and control of rail creep by rail force transducers Sibson K A F 1987-1
Strategy behind Hunter Valley track strengthening Mahood J M F 1987-1
Ballast grading Oldroyd D F 1987-2
Resilient rail fastenings and Pandrol International Ltd., 1937 - 1987 Goodwin W H F 1987-2
Mark III sleeping cars Brien R R  - 1987-2
Supervisory training scheme Betley J M 1987-2
Ayrshire electrification Thatcher L J  - 1987-2
Wheat Line upgrading - Weemelah Churchill A F 1987-2
Merseyrail DC system and its civil engineering problems Heath R M  - 1987-3
Light rapid transit for Greater Manchester Young A P  - 1987-3
Reconstruction of Bridge D.29 District/Piccadilly/Central Lines, Ealing Stanley R  - 1987-3
Strathclyde PTE and its effect on civil engineering Pitts J B F P 1988-1
Ipswich Tunnel - slab track Sibley P O F 1988-1
Docklands Light Railway Ebbutt P C  - 1988-1
Thameslink - reopening Blackfriars to Farringdon Evans P J F 1988-1
Role of the Area Manager Taylor R K  - 1988-2
Concrete sleepers (Australia) Birks F J AF 1988-2
Mount Newman Mining switch upgrade Stephen H D AF 1988-2
Rail/wheel - getting the best performance from each Martinovich M P AF 1988-2
Southend Pier Railway Carson D J AF 1988-2
Dublin area rapid transit civil engineering Waters C D  - 1988-2
New York subways Orchard G R / Mitchell R F F / F 1988-2
Channel Tunnel - long term railway prospects Alexander N J B  - 1988-3
Manufacture of concrete sleepers Browne F J  F 1988-3
Vegetation control on London Regional Transport Jessett J  - 1988-3
Irish Railways Jennings P O F P 1989-1
A55 North Wales Coast road, Conwy crossing Fitch J R / Stone P A  - / - 1989-1
Bomac system - history and recent developments Taylor Dr H P J / Rayner M S  F / F 1989-1
Japanese Railway civil engineering White P J F 1989-2
Cheap and cheerful Hill-Smith D F 1989-2
Practical platelaying Watson R AM 1989-2
The Kyle Line - a railway revived MacDonald I AF 1989-2
The Edgecumbe earthquake (New Zealand) Rawlings T J F 1989-2
Development and construction of the Bo'ness Railway Watson J AF 1989-2
Demise of Broad Street Station, London Pryer H AF 1989-2
Down Coal relay (Australia) Hill I F 1989-2
Scotrail Provincial - vision for success Leah C R  - 1989-3
25th Congress of IRCA and UIC Dannat Lt Col H M F 1989-3
Melbourne Tramway system Snell F D  - 1989-3
Extension of Piccadilly Line to Heathrow Terminal 4 Hornby D J F 1989-3
Avon - Goomalling resleepering project Birks F J AF 1989-3
Adelaide Metropolitan signalling project Davis K A / Price J A  - / - 1989-3
Adelaide Hills Tunnels - track lowering Sharpe T M 1989-3
York remodelling Collins M / Midgley J AF / AF 1990-1
Bridging the Georges River at East Hills Harper M  - 1990-1
Rail upgrading project begins (Canada) Hart A  - 1990-1
Research and development at Pandrol International Leeves G G / Rhodes D F / AF 1990-1
London tube track and tunnels, 1890 - 1990 Buekett J F 1990-2
Ness Viaduct reconstruction, 1. Collapse of original bridge McCleod D F 1990-2
Ness Viaduct reconstruction, 2. Operating without the Viaduct Summers J AF 1990-2
Ness Viaduct reconstruction, 3. Design and construction Ford C R  - 1990-2
Plastic dry bearings in switch slide baseplates Bishop D M / Chambers J F / - 1990-2
Rail surface treatment buys extra life (South Africa) Hoffman D W F 1990-3
Railways past and present Humphries E F 1990-3
Visit to the U S A in 1938 Matthews D R B F 1990-3
Development of BR trackside warning systems Bot K G F 1991-1
Maintenance of high density suburban railways Green C E W  - 1991-2
Monitoring reliability Crease R J F 1991-2
Track reliability technical developments Stuckey D J F 1991-2
The Dutch experience van de Lindt D  - 1991-2
Docklands Railway - starting from scratch Hughes D C  - 1991-2
Developments in the pipeline Jefferies N P F 1991-2
Fifty years of the North Wales Section Morris D F 1991-2
Track installation, maintenance, and renewal on LUL Bonnett C F F 1991-3
Rebuilding cities around rail Newman P  - 1991-3
Phillipine transport Carson D J AF 1991-3
A look back Duncan W AF 1991-3
Swing nose crossings and accessories (Australia) Barry G  - 1991-3
Maintaining a freight only railway Joyce D F 1992-1
Maintaining a mixed traffic railway Savage A F 1992-1
Dangerous goods Ellis J B F 1992-1
The effect of heavy axle traffic on bridges Bastin R AF 1992-1
The views of a permanent way supervisor Maclaughlin D  - 1992-1
Environmental noise and vibration controls for railway operations Clegg J D  - 1992-1
The experiences of British Steel PLC Grisdale P F 1992-1
Freight traffic standards Donald J AF 1992-1
Research projects for freight railways Sunley K F 1992-1
Semaphore signalling in the Western Region of BR Mills B P  AF 1992-2
New innovations in rail grinding Cooper J  - 1992-2
The design and construction of Stansted Airport Rail Link Campion R/Wood A/Craig R/Runacres A F / F / - / - 1992-3
Neath Valley railways Evans R F 1992-3
The Severn Railway Tunnel Buxton J F 1992-3
Relaying the Mancunian way Jones D C AF 1993-1
40 odd years on the permanent way Redmond D M 1993-1
Composite steel/timber sleeper track structure performance Syers J F 1993-1
Structure gauging: route assessment work for Railfreight Distribution Pilkington W F 1993-1
Platform track stabilisation and reconditioning Sharpe G / Thiele R AF / AF 1993-1
Leeds North West electrification - 1 Mackay K  - 1993-2
Leeds North West electrification - 2 Collins M   AF 1993-2
Sixty two years in the Permanent Way Institution Hughes RV HLM 1993-3
Railway sleeper - 50 years of concrete sleepers Taylor Dr H J P / Rayner M S F / F 1993-3
Permanent way perils and problems Mulligan P M 1993-3
New York railways - the experience Knight P F 1993-3
Toptrack curve realignment programme Seshagiri Rao M F 1993-3
Adelaide to Melbourne standard gauge connection Milton P F 1993-3
Road level crossings - 1 Development of legislation Bellwood A AF 1993-3
Road level crossings - 2 Operations and safety Haynes P  - 1993-3
Oh Mr Porter, what shall I do ? Jenkins H  - 1994-1
Commercialisation of permanent way maintenance Hill-Smith D F 1994-1
Network SouthEast, S E Division, Infrastructure 2000 project McNaughton A F 1994-2
Rail and wheel flange lubrication de Koker J F 1994-2
Manual metal arc repair of Newark square crossing Sawdon R W M 1994-2
China, railway expansion plans, 1992 - 2001 Chorley R M F 1994-2
Channel Tunnel trackwork Davies P H F 1994-3
Railway engineering in the army for the 1990s Brown R F 1994-3
Building the Bennett Brook Railway Watson L AM 1994-3
Planning and execution of track renewals Campbell P J M 1994-3
The young engineer's challenge Heath R M F 1995-1
The Pandrol Fastclip Brown T P / Larke R D F / F 1995-1
What niggles the passenger Bernard B F 1995-1
Birmingham cross-city electrification Brimicombe D F F 1995-1
Bauxite contamination and remedial measures O'Brien A / Bird M F / M 1995-2
Rottnest Island - restoration of military railway Bradley K F 1995-2
Central Railway of Peru Stephenson T H F 1995-2
Technical developments in Hong Kong MTRC permanent way Keefe R M F 1995-2
Future track structure Cornell J S  F 1995-3
Steel rails across America Kirkland P F 1995-3
Cheap and cheerful Hamer Rev E D AF 1995-3
Remote ambient temperature system for heat speed restrictions Raeside P AF 1995-3
Cost effective track maintenance and renewals Ogilvie N  - 1996-1
Cost effective timber sleeper maintenance Oliver A C  - 1996-1
Relaying with steel sleepers Taylor M  - 1996-1
Engineering the track as a component of an infrastructure system (LUL) Gallatley M J  - 1996-1
Rail grinding Cooper J  - 1996-1
Productivity improvements in on-track maintenance and renewal machines Wenty R  - 1996-1
Permanent way safety and protection of the environment Horsham P F 1996-2
The railway on the Tsing Ma Bridge, Hong Kong Cope G H F 1996-2
Railway engineering risk assessment and risk management Marks R M F 1996-2
The history and development of rail stressing equipment Bean D AF 1996-3
Level crossings - the ultimate solution Coates Smith P F 1996-3
Waste by rail Cunliffe J P F 1996-3
Non-destructive testing of rails Hall Dr K G  - 1997-1
Project Redmire Kirkland P / Stoddart M F / AF 1997-1
The Talyllyn Railway and its track McCanna W  - 1997-1
Box culvert installation, Trans Australia Railway Freeth T / Adeney M  - / - 1997-1
The infrastructure of Irish Rail Garvey B J F P 1997-2
Development of rail welding Lugg P J C F 1997-2
Reballasting of the Kowloon - Canton Railway, Hong Kong Fenlon P J F 1997-2
The International Safety System and the permanent way of Irish Rail McMahon P  - 1997-2
Wheels; an interface view Crawshaw P  - 1997-3
The rail/wheel interface Gail S H  - 1997-3
Gauge spreading forces Eickhoff B  - 1997-3
Rail defects Smith M  - 1997-3
Wakefield Europort Benton D AF 1997-3
Restoration of the line at Mayoba Bridge, Zambia Skippings D O F 1998-1
Upgrading of the Belfast - Lisburn route of the Northern Ireland Railways Brown R H / Hichman T R / Barnett J C  - / - / - 1998-1
Vietnam Railways - a visit to Hanoi Fenlon P J F 1998-1
Sishen - Saldanha Line - rehabilitation of concrete sleepers Rademeyer G AF 1998-1
The last decade of Rhodesia Railways - an engineer's perspective Bryer T F 1998-2
Luas - Dublin's light rail transit Sheedy M  - 1998-2
Broken Hill Line floods: Febryary 1997, track restoration Jaehne P  - 1998-2
The Firefly project Mosse J  - 1998-2
Rail infrastructure developments in Northern Ireland Barnett J / Atkinson M  - / - 1998-2
Experience in partnering - a better way to manage railway projects Neale D M 1998-3
Rails to Bolton Abbey Barlow D AF 1998-3
Chiltern Lines capacity works Cook A M 1998-3
St Bees sea defences - a team approach Breen M / Cummings R  - / - 1998-3
Paddington masterplan Hellier N F 1998-3
Rebuilding the Welsh Highland Railway Savage A M 1999-1
Bosnia & Herzegovina, a rail system emerging from war Brown R F 1999-1
The Jubilee Line extension project Lim A AF 1999-1
Developing the network - Great Eastern resignalling Mirtle F  - 1999-1
Eight-span rail deck culvert installation, Trans Australia Railway Freeth T / Stonehouse P M / M 1999-1
The time is right for stoneblower Nicholas R M 1999-2
Urban passenger railway track design issue - North America/UK Williams J I F 1999-2
The safety of railway track workers Wheeler C J F 1999-2
Blackpool and Fleetwood Tramroad Vaughan B  - 1999-2
The maintenance of Blackpool trams Gibson W  - 1999-2
The upgrading of Irish railway bridges Madden B  - 1999-2
A traditional image in traditional weather Tulloch R  - 1999-2
Drug effects and testing on railways and transport systems Cunliffe J P F 1999-3
Increasing performance from on-track machines Bull P F 1999-3
Mobile flashbutt welding Goldie C F 1999-3
Track geometry measurements with the Autograph trolley Tunna Dr J M / Hough A  - / - 1999-3
Experiences with rail in-motion weighbridges in Western Australia Green C F 2000-1
Trakrat - a new generation general purpose utility vehicle Leyland A AF 2000-1
Safety on track - today and tomorrow Wheeler C J F 2000-1
Stoneblower experiences Nutbrown D / Nicholas R F / - 2000-1
The path to world class infrastructure maintenance Williams G  - 2000-1
The Railway Industry Training Council Chappell J  - 2000-1
The maintenance of rail integrity Manning J R F 2000-1
Rail management - the Hong Kong Mass Transit experience Dring J F 2000-2
Railway buildings - low disturbance in situ timber renewal Moore D  - 2000-2
Robert Stephenson and the High Level Bridge McConway J A F 2000-2
Manchester Metrolink - getting to Salford Quays and Eccles Roberts F J F 2000-3
Growing rail business: implications for track infrastructure Marais J  - 2000-3
RT60 - track for the new millennium Morgan J C F 2000-3
Trackbed investigation Sharpe Dr P F 2000-3
Rapid response Winder K  - 2000-3
An overview of steel sleeper usage in Australia Townsend S AF 2000-3
Bodensee - Toggenburg - Bahn Schoch Dr G  - 2000-4
Big railway projects in Switzerland Winter Dr P  - 2000-4
Tight curve problems and the attempts to solve them - LUL's Caxton curve Whiston A AF 2000-4
Standardisation of the Tailem Bend to Pinnaroo Line, South Australia Ward C M 2000-4
A company portrait of Appenzellerbahnen Vogt M M 2001-1
European standards for railway track products Buekett J F 2001-1
Rail solutions 2000 Pollard N  - 2001-1
2000 - year of RT60 S & C development - our part in the leap towards modern S & C Foan A F 2001-1
Track quality: getting specific Ryder E  - 2001-1
Rail and rail transit accident reconstruction Cunliffe J P F 2001-2
Welding of rails - the TW gas pressure welding project Johnson R  - 2001-2
The Dete straight, and the 91 lb relay Brown S A S  - 2001-2
Risk based ultrasonic rail test scheduling on Burlington Northern Santa Fe Palese J W / Wright T W   - / - 2001-2
The Eritrean railway project Badcock Dr P M 2001-2
Maintaining high standards efficiently Nutbrown D F 2001-3
United States experience with commuter rail on existing freight lines McGinley M E  M 2001-3
Permanently on the way Armstrong W T F 2001-3
High speed crossings Bateman D L F 2001-3
Innovations by Rites Ltd in mechanical designs Kochak R S   - 2001-3
Safety in the chemical industry Hirst R  - 2001-3
Ballast on my boots Rackley S J   - 2001-4
Standard gauge railway Albury to Melbourne - a retrospection Richards Dr I  - 2001-4
High speed trains around the world: prospects for India Singh K P  - 2001-4
Fresh impetus for the Hejaz Railway Ablett B M 2001-4
21st Century rail Boulger R F P 2002-1
Utilities within the railway corridor Tye F M 2002-1
The train's contribution to gauge corner cracking Sinclair J C M 2002-1
Adelaide Convention Centre project Charlton K D / Edmead D J   - / - 2002-1
Developments of an occupational health & safety system É TransAdelaide Charlton K D    -  2002-1
The next generation - providing continuity of engineering skills within the rail industry Blackwood H  - 2002-2
A history of rail - with particular reference to South Australia Griffiths D  - 2002-2
Transportation and technology Ray Dr S K  - 2002-2
The Euston Alliance project Leslie Y / Pownall W  - / F 2002-3
The railways of the Wiltshire stone quarries Tye F M 2002-3
CTRL track design and construction Edwards P F 2002-3
An undergraduate degree course in railway infrastructure engineering Frost Dr M / Abbiss J  - / - 2002-3
Upgrading S & C for the future Bateman D L F 2002-4
This summer's gone to pot! Kirkland P F 2002-4
Railbam and WCM wayside detection systems S outhern C / Kopke U  - / - 2002-4
A description of turnouts installed at Stirling North by ARTC Townsend S F 2002-4
Track renewal on Zambian copperbelt mines Skippings D F 2002-4
A reality check on the Alice Springs to Darwin Railway Duncan C  - 2003-1
Points to ponder - a trackman's view Woods S M W M 2003-1
Planning and building of the Stirling North Underpass Wyatt R  - 2003-1
Project 271 - temporary track in Africa Hamer Rev E F 2003-1
System continuity project - Port Augusta Glynn S  - 2003-1
Stub points - an intere+A1613sting anachronism Cunliffe J P F 2003-1
Some reflections on my two years as President of the PWI Boulger R F P 2003-1
Engineering our future McNaughton A F P 2003-1
Introducing track machine guidance into the UK Spoors R F 2003-2
Networking to improve on-track safety for the railway family Wheeler C J F 2003-2
Rail grinding and ultrasonic rail flaw detection White M  - 2003-2
A description of steel resleepering operations by Queensland Rail Townsville/Cairns Townsend S F 2003-2
Seeing the point Townsend D  - 2003-2
A joint pilot study into Rolling Contact Fatigue Wilkinson D / Pinchen R  - / F 2003-3
Establishing track renewal quality on the WCML Spoors R F 2003-3
Design, construction and management system of u/ground segments of Delhi Metro Chaudhary R  -  2003-3
The transport of dangerous goods and effects on railway maintenance companies MacRae C  -  2003-3
Whole life costing - the Dutch experience Zoeteman A  - 2003-4
A brief overview of rail history in the Port Adelaide area Stewien R F 2003-4
Repair and upgrading of the Commercial Road Viaduct at Port Adelaide Charlton K F 2003-4
Tarquin: Mott MacDonald's track and ride quality investigation Brocklebank H/Brooks D/Ellis I/Norbury K   - / - / M / -  2003-4
Installation of the new scissors crossover at Roma St., Brisbane Beh G/Stevens R F / - 2003-4
Track drainage principles and assessment of flows in the railway catchment Fox L M 2004-1
Implementation of 3-point geometry for permanent way renewals Spoors R F P 2004-1
Rebuilding the Welsh Highland Railway - Part 2 Savage A F 2004-1
The Settle and Carlisle track renewals project Goldie C F 2004-1
The transport of diesel - update to Dangerous Goods Regulations MacRae C M 2004-1
Holywell blockade: track renewal and drainage replacement Barlow D/Ablett B M / M 2004-1
Adelaide trams - their past and future Townsend S F 2004-1
Switch and crossing maintenance - a high level view Ryder E F VP 2004-2
Construction of the Strasbourg tramway system Poinseaux B  - 2004-2
Surveying with the Swiss Trolley on the WCML - a simple approach for track renewals Peels G/Dale S M / - 2004-2
Rail stress and rail stress management Bateman D L F 2004-2
Switches and crossings - design Morgan J C F 2004-2
Switches and crossings - materials Westoby M  - 2004-2
Switches and crossings - inspection of the manufactured layout Kara M/Turner A  - / F 2004-2
The Waverley Route Project Anton L M 2004-2
Rolling Contact Fatigue (RCF) in the UK system - the emerging solution Dembosky M M 2004-3
Safety awareness and our (non) use of ATWS in Britain Wheeler C J F 2004-3
Track stiffness management using the XiTRACK geocomposite Thompson DR/Woodward PK M / M 2004-3
Switch and crossing installation Kitching I F 2004-3
The Forest of Dean Branch Mills B M 2004-3
Rail grinding - an Indian experience Sharma S  - 2004-3
C408 Northolt to West Ruislip - the westboumd Central Line Plummer J M 2004-4
High output mechanised spot resleepering Jarvis F/Leyland A/Twigt E M / M / - 2004-4
Nottingham Express Transit - Britain's newest tramway Pennington C  - 2004-4
The Postlingbergbahn of Linz - a 1 in 10 adhesion railway Hamer Rev E F Ed 2004-4
Operational experinces with overseas light rail systems Haring L/van Westenbrugge H  - / - 2004-4
The Devil's in the detail - an introduction to interdisciplinary design coordination Ellis I M 2004-4
NOTES
 
1  This document was prepared by John C Morgan, former Director and Overseas Secretary
2  Abbreviations:
               P         President
               PP       Past President
               VP       Vice President
               Pat      Patron
               F         Fellow
              AF       Associate Fellow
              M        Member
              AM      Associate Member
              S         Student
              LM       Life Member
              HLM    Honorary Life Member
              Ed       Editor
              Sec     General Secretary
               -        Unknown or non-member